My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Flow Control Valve Maintenance, Rehabilitation, and Replacement at City Water
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024
>
Item 21 - Flow Control Valve Maintenance, Rehabilitation, and Replacement at City Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 11:44:48 AM
Creation date
7/31/2024 12:21:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
8/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
all safeguards, safety devices and protective equipment, and shall take any and all <br />actions appropriate to providing a safe Project site. <br />The following is required in addition to the requirements of the Standard Specification: <br />1. The Proposer shall train all employees, or subcontractor personnel in the work <br />practices necessary to safely perform his or her job. <br />2. The Proposer shall identify all known potential hazards related to the work <br />performed and train all employees and subcontractor personnel on how to handle <br />the potential hazards. <br />3. The Proposer, their employees and subcontractors shall follow all safety rules and <br />safe work practices. <br />4. The Proposer will immediately notify the City of any significant and/or unusual <br />hazards found during the course of work. <br />5. The Proposer shall submit copies of Safety Data Sheets (SDS) for all hazardous <br />materials to be utilized on site in the performance of work. The Proposer is solely <br />responsible for the legal disposal of hazardous waste generated in the <br />performance of their work. <br />Safety Indemnification: To the extent allowed by law, the Proposer agrees to defend, <br />indemnify and hold harmless the City, its officers, employees and agents from and against <br />any and all investigations, complaints, citations, liability, expense (including defense costs <br />and legal fees), claims and/or causes of action for damages of any nature whatsoever, <br />including but not limited to injury or death to employees of the Proposer, its subcontractors <br />or City, attributable to any alleged act or omission of the Proposer or its subcontractors <br />which is in violation of any Cal OSHA regulation. The obligation to defend, indemnify and <br />hold harmless includes all investigations and proceedings associated with purported <br />violations of Section 336.10 of Title 8 of the California Code of Regulations pertaining to <br />multi -employer work sites. The City may deduct from any payment otherwise due the <br />Proposer any costs incurred or anticipated to be incurred by the Agency, including legal <br />fees and staff costs, associated with any investigation or enforcement proceedings <br />brought by Cal OSHA arising out of the assigned work. <br />II. INSTRUCTIONS TO PROPOSERS <br />A. CITY RESPONSIBILITIES <br />The City will provide information in its possession relevant to preparation of required <br />information in RFP. The City will provide only the staff assistance and documentation <br />specifically referred to herein. <br />B. PROPOSER RESPONSIBILITIES <br />Point of Contact: The selected proposer will assume responsibility for all services in its <br />proposal. The selected proposer shall identify a sole point of contact with the greatest <br />City of Santa Ana RFP 24-050 <br />Flow Control Valve Maintenance and Rehabilitation Services <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.