My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Flow Control Valve Maintenance, Rehabilitation, and Replacement at City Water
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024
>
Item 21 - Flow Control Valve Maintenance, Rehabilitation, and Replacement at City Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 11:44:48 AM
Creation date
7/31/2024 12:21:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
8/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. PROPOSAL TERMS AND CONDITIONS <br />By submitting a Proposal, the Proposer acknowledges that it has thoroughly examined and <br />accepts the Terms and Conditions of this RFP as described below: <br />A. EXAMINATION <br />Proposer represent that it has thoroughly examined and become familiar with the services <br />and responsibilities required this RFP and that it is capable of effectively and efficiently <br />performing quality work to achieve the City's objectives. Any attachments referenced <br />herein or any interpretations, clarifications or amendments subsequently posted in the <br />relation to this RFP are fully incorporated. <br />B. EXECUTION OF AGREEMENT <br />The City and the selected Proposer will enter into an Agreement similar to that as shown <br />in ATTACHMENT 4: STANDARD AGREEMENT in the Appendix of this RFP. If a <br />Proposer is unwilling or unable to execute an Agreement within thirty (30) days after being <br />notified of selection under this RFP, the City reserves the right to select the next most <br />qualified Proposer or call for new Proposals, whichever the City deems most appropriate. <br />C. PROPOSAL VALIDITY <br />Services, pricing and warranties indicated in a respondent's Proposal must be valid for a <br />period of 120 days after the submission of the Proposal. <br />D. PRE -CONTRACTUAL EXPENSES <br />Santa Ana shall not, in any event, be liable for any pre -contractual expenses incurred by <br />Proposers in the preparation of its proposal. <br />E. JOINT OFFERS/SUBCONSULTANTS <br />Where two or more Proposers desire to submit a single Proposal in response to this RFP, <br />they should do so on a prime sub -consultant basis. The City intends to contract with a <br />single firm and not with multiple firms doing business as a joint venture. Should the use <br />of sub -consultants be offered, the Proposer shall provide the same assurances of <br />competence for the sub -consultant plus the demonstrated ability to manage and <br />supervise the subcontracted work. Sub -consultants shall not be allowed to further <br />subcontract with others for work under the Agreement. The provisions of the Agreement <br />shall apply to all sub -consultants in the same manner as the Proposer. <br />F. SAFETY PROGRAM REQUIREMENTS <br />Work Site Safety shall be as defined by the Standard Specifications and these special <br />provisions: <br />The Proposer shall be solely responsible for ensuring that all work performed under the <br />contract is performed in strict compliance with all applicable Federal, State and local <br />occupational safety regulations. The Consultant/Contractor shall provide at its expense <br />City of Santa Ana RFP 24-050 <br />Flow Control Valve Maintenance and Rehabilitation Services <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.