My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Fleet Electrification and Electric Vehicle Charging Master Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/06/2024
>
Item 23 - Fleet Electrification and Electric Vehicle Charging Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 11:45:52 AM
Creation date
7/31/2024 12:22:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23
Date
8/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICF Proposal for City of Santa Ana Fleet Electrification & Electric Vehicle Master Plan February 27, 2024 <br />used and when they were not. Using these results, it was possible to recommend 3 additional locations for the <br />bikeshare bikes, as well as which locations had the greatest utilization. <br />Heavy Duty Fuel Cell Truck Clinic Project, Toyota Motors North America, 09/2017 — 05/2018 <br />Team Lead — Duncan led a team of 5 engineers and scientists in a project partnering with Toyota in Gardena, CA <br />developing a concept for a regenerative braking system for the Project Portal hydrogen fuel cell truck. As part of this <br />project, Duncan helped research different technologies for storing the energy generated by braking, and performing <br />battery cycle tests to determine whether the proposed battery would be able to work with the proposed application. In <br />addition, he developed a first -principles model to measure the braking energy generated by a Class 8 truck on <br />several routes originating at the Port of Los Angeles which was used to estimate how much the efficiency of the <br />vehicle would improve through the use of this braking energy. Duncan participated in several instrumented drives to <br />generate data for the model using real -world heavy-duty truck driving conditions. <br />Concept of Operations Software Application, Birdi Systems Inc, 03/2019-08/2019 <br />Software Engineer. Duncan co -led the development of an internal software application for the administration of the <br />Systems Facilities Operational Readiness (SFOR) business process. This software was designed to store, manage, <br />and communicate with stakeholders all the information and insights generated as part of the 5 phases of SFOR <br />including (1) Current Conditions Assessment, (2) Future Conditions Analysis, (3) Gap Analysis and (4) Risk Analysis <br />and (5) Risk Mitigation. This system has since been used by the company on multiple major infrastructure projects <br />including the LAX Automated People Mover project and the LA Metro Emergency Security Operations Center project. <br />It was developed using JS and SQL databases. <br />Emergency Security Operations Center (ESOC) Design, LA Metro,1212020-0612021 <br />Owner's Representative. Duncan was a key member of the owner's representative team for LA Metro's Emergency <br />Security Operation Center project, helping to ensure that the designs for the systems for the building would support <br />the desired operational outcomes for LA Metro for emergencies and for operations of their bus and rail fleet. He <br />supported design revisions and contributed towards the development of a Concept of Operations for the ESOC. He <br />also helped manage requirements disagreements between LA Metro and the main contractor for the project. <br />CCTV Design and Construction for Bradley West Terminal— LAWA, 04/2020—12/2020 <br />Project Engineer — Duncan was the main project engineer for installation, inspection, commissionining and design <br />changes for the CCTV camera system installed for the new Bradley West international terminal at LAX. Duncan <br />helped to manage and QC the work of technicians alongside the superintendent to ensure that deadlines were met. <br />He vastly accelerated the pace of inspections and commissioning of cameras and IT hardware by the team and LAX <br />to ensure that the building could be handed over to airlines in operational condition by 2021. Duncan worked with <br />numerous contractors across construction disciplines to ensure that locations were ready for installation as promised. <br />Further, he mitigated the delays caused by the COVID pandemic as much as practicable. <br />Concept of Operations for LAX Central Utility Plant, LAWA, 08/2018 — 0512019 <br />Project Engineer — Duncan helped to develop and implement the Systems Facilities Operational Readiness <br />assessment of the Central Utility Plant at LAX as part of a four -person team. He conducted over a dozen interviews <br />with operational staff in addition to a detailed review of the facility drawings and operational data. He completed a <br />comprehensive gap analysis, risk analysis and risk mitigation plan. He developed several projects with an estimated <br />savings of over $5 million annually and payback period of <3 years. <br />EMPLOYMENT HISTORY <br />ICF. Senior Transportation Specialist. Sacramento. 7/2023— Present. <br />UC Davis Sustainable Freight Program. Graduate Student Researcher. Davis. 1/2022-6/2023. <br />Birdi Systems Inc. Systems Engineer. Pasadena. 08/2018-6/2021. <br />Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.