Laserfiche WebLink
OL)OUTDOOR E <br />DIMENSIONS ° <br />SIGNS - BANNERS - FLAGS - INTERIOR DESIGN... <br />vi. Once structure is completely dry it will be transferred to assembly <br />O <br />department where electrical components will be assembled. N <br />vii. Final step in production will be layered anti -graffiti coat application. <br />b. Representatives from City of Santa Ana are welcome to visit OD during the i <br />O <br />O <br />production process as desired <br />c. Completed signs will be inspected against approved shop drawings and samples O <br />by dedicated quality control inspection team <br />d. Proposed designs production timeline approximately 5-7 weeks to complete per <br />location. <br />5) Quality review <br />a. Client is invited to inspect signage after production, but before installation <br />b. Any quality issues found will be addressed before installation dates <br />6) Site Walk and Preparation (per job site) <br />a. Site safety plan to be worked out with City of Santa Ana construction team <br />i. Will include lift safety plan and access plan for any overhead signage <br />b. Final field conditional and measurements to be verified by Outdoor Dimensions <br />5325 East Hunter Avenue, Anaheim CA. 90807 P: 714.579.9555 F: 714.893.5978 <br />© 2019 Outdoor Dimensions, LLC. All Rights Reserved. <br />