ZOA No. 2024-01 for South Coast Technology Center at 3100 West Lake Center Drive <br />August 6, 2024 <br />Page 11 <br />evaluated whether the potential environmental impacts are addressed in the City of <br />Santa Ana General Plan Update Final Recirculated Program Environmental Impact <br />Report (GPU EIR). Specifically, the analysis evaluates demolition of the three existing <br />office buildings, a parking structure, and parking lots to construct three new Class A <br />industrial buildings for office, manufacturing, and/or warehouse use, ancillary <br />improvements including landscaping, parking, freestanding signage, site lighting, and <br />fencing as well as proposed off -site improvements including replacing asphalt, new <br />grind and overlay, relocating the tree wells from the sidewalk to back of sidewalk, and <br />modifications to sidewalks as needed to ensure ADA compliance. <br />CEQA Guidelines Section 15183 allows a streamlined environmental review process for <br />projects that are consistent with the densities established by existing zoning, community <br />plan, or general plan policies for which an environmental impact report (EIR) was <br />certified and does not require additional environmental review, except as might be <br />necessary to examine whether there are project -specific significant effects which are <br />peculiar to the project or its site. Moreover, projects that are consistent with the <br />densities and use characteristics considered by the GPU EIR may qualify for the CEQA <br />Guidelines Section 15183 Exemption process. Specifically, as set forth in CEQA <br />Guidelines Section 15183(d), the15183 exemption applies to projects which meet the <br />following conditions: <br />1. The project is consistent with: <br />A. A community plan adopted as part of a general plan, <br />B. A zoning action which zoned or designated the parcel on which the project <br />would be located to accommodate a particular density of development, or <br />C. A general plan of a local agency, and <br />2. An EIR was certified by the lead agency for the zoning action, the community <br />plan, or the general plan. <br />The GPU was adopted, and the GPU EIR certified, in April 2022 (State Clearinghouse <br />Number 2020029087); the GPU went into effect on May 26, 2022. Any decision by the <br />City affecting land use and development must be consistent with the GPU. The GPU <br />EIR evaluates the potential environmental effects associated with implementation of the <br />GPU and addresses appropriate and feasible mitigation measures that would minimize <br />or eliminate these impacts. Pursuant to Section 15183(i)(2) of the CEQA Guidelines, a <br />project is consistent with the GPU if the development density does not exceed what was <br />contemplated and analyzed for the parcel(s) in the certified GPU EIR and complies with <br />the associated standards applicable to that development density. Development density <br />standards can include the number of dwelling units per acre, the number of people in a <br />given area, floor area ratio (FAR), and other measures of building intensity, building <br />height, size limitations, and use restrictions. <br />