Laserfiche WebLink
cover to serve as filler materials. Other organic or inorganic materials <br />are not accepted for substitution for ground cover or turf. <br />7. Enforcement. The penal provisions and permit requirements set forth in Article <br />VIII of the (SAMC) Santa Ana Muninipal Code (effective as of the date of <br />adoption of this Specific Development Plan) shall apply to all development <br />within the Lake renter Specific Development Plan SD-58. <br />8. Perimeter Fencing. All perimeter fencing abutting a public street or private <br />street shall be of decorative, "see -through" material, such as wrought -iron, but <br />in no event shall such fencing be a chain -link material. Such fencing shall be <br />setback at least ten feet (10') from the public right-of-way (the "Public Setback") <br />with landscaping, as approved by the City per Section 6.6 (Landscape <br />Standards) above, between the fencing and the public right-of-way. Provided, <br />however, the Public Setback may be less than ten feet (10') from the public <br />right-of-way to accommodate code -required, accessible exits through such <br />fencina. The Dortion of the Derimeter fencina that is less than ten feet (10') to <br />accommodate such code -required, accessible exit shall not exceed a length of <br />twenty feet (20') as measured parallel to the right-of-way. Perimeter fencing <br />along interior property lines, if any, shall comply with Section 11.8.1 of the City's <br />Industrial Design Guidelines. No perimeter fencing shall exceed seven (7) feet <br />in height as measured from the adjacent grade without the prior authorization <br />by the CitV_ <br />Section 7 8 - Operational Standards <br />1. Conditions Covenants and Restrictions (CC & R's) shall be provided which <br />requires future tenants and property owners to participate in the required <br />Transportation Demand Management Program and other mitigation measures as <br />specified in the Environmental Impact Report, or prepared CEQA Exemption <br />15183 Environmental Documentation. <br />2. Each future structure(s) shall be required to demonstrate conformity with the <br />applicable provisions of this Specific Development Plan SD-58 submit r Sito�R <br />Review to ensure Genfermity with the nnactor Plan and certified Environmental <br />Impact Report, or prepared CEQA Exemption 15183 Environmental <br />Documentation, to provide the opportunity to apply conditions to ensure <br />compliance. <br />3. Prior to issuance of a Utility Release complete the following: <br />Ordinance No. NS-XXXX <br />Page 13 of 22 <br />