SOUTH COAST TECHNOLOGY CENTER
<br />3100 Lake Center Drive, Santa Ana, California
<br />SHEET INDEX:
<br />T-1 Title Sheet
<br />T-2 Notes
<br />A-1.1 Overall Existing Site Plan
<br />A-1.2 Overall Fire Access & Accessible Path of Travel Site Plan
<br />A-1.3 Overall Trash Collection Site Plan
<br />A-1.4 Building 1 - Enlarged Site Plan
<br />A-1.5 Buildings 2 & 3 - Enlarged Site Plan
<br />A-1.5A Building 3 Site Plan - 40' & 60' Yards
<br />A-1.6 Overall WB-67 Truck Access -In Site Plan
<br />A-1.7 Overall WB-67 Truck Access -Out Site Plan
<br />A-1.8 Trash Enclosure Enlarge Plan & Details
<br />Site Plan Review
<br />3rd u b m itta I (Includes Bldg. 3 Slip Sheets)
<br />VICINITY MAP:
<br /># ,-Z'h-4 - !
<br />W
<br />I -ar
<br />Per anente...y
<br />o
<br />Deo
<br />it _, �, .- � • .
<br />profession
<br />'Super King
<br />Market 'Santa -Ana
<br />hur Blvd .
<br />-�- 0 0 , nve B
<br />n�iwr Iy
<br />him
<br />_ it in
<br />Cor Movate Park
<br />is
<br />1 w_ 1( 3
<br />Jr
<br />_
<br />Tec_ D
<br />�,�.- 1N .IeCo rfy,, ,t" See •
<br />_- Csei non,. k
<br />r ve W Sun Rol er A W $W1f10 e e Sunflovrer-A a W `•
<br />° c» M• l■= i1,
<br />g. Cas o .a /McC nn �4f 00
<br />a .i ■ d ,
<br />0
<br />C-2.0
<br />Existing
<br />Conditions
<br />Key Plan
<br />C-2.1
<br />Existing
<br />Conditions
<br />Plan
<br />C-2.2
<br />Existing
<br />Conditions
<br />Plan
<br />C-2.3
<br />Existing
<br />Conditions
<br />Plan
<br />C-2.4
<br />Existing
<br />Conditions
<br />Plan
<br />C-2.5
<br />Existing
<br />Conditions
<br />Plan
<br />C-2.6
<br />Existing
<br />Conditions
<br />Plan
<br />C-2.7
<br />Existing
<br />Major Street Cross -Section
<br />C-3.1
<br />Grading Plan
<br />C-3.2
<br />Grading Plan
<br />C-3.3
<br />Grading Plan
<br />C-3.4
<br />Offsite Improvement Plan
<br />C-3.5
<br />Offsite Improvement Plan
<br />C-3.6
<br />Offsite Improvement Plan
<br />C-4.1
<br />Utility Plan
<br />C-4.2
<br />Utility Plan
<br />C-4.3
<br />Utility Plan
<br />C-5.1 Fire Access and Hydrant Plan
<br />C-6.1 BMP Exhibit
<br />L-1 Overall Landscape Concept Plan
<br />L-2 Building 1 Landscape Concept Plan
<br />L-3 Building 2 &3 Landscape Concept Plan
<br />L-4 Park Plaza & Corner Landscape Concept Enlargement Plan
<br />L-5 Building Entry & Patio Landscape Concept Enlargement Plan
<br />A-2.1 Building 1 - 1st Floor Plan
<br />A-2.2 Building 2 - 1 st Floor Plan
<br />A-2.3 Building 3 - 1 st Floor Plan
<br />A-3.1
<br />Renderings Building 2
<br />A-3.2
<br />Renderings Building 2
<br />A-3.3
<br />Renderings Building 1
<br />A-3.4
<br />Renderings Building 2 & 3
<br />A-3.5
<br />Renderings Park
<br />A-4.1
<br />Building 1 Exterior Elevations
<br />A-4.2
<br />Building 1 Exterior Elevations & Section
<br />A-4.3
<br />Building 2 Exterior Elevations
<br />A-4.4
<br />Building 2 Exterior Elevations & Section
<br />A-4.5
<br />Building 3 Exterior Elevations
<br />A-4.6
<br />Building 3 Exterior Elevations & Section
<br />OWNER/ C.J. SEGERSTROM & SONS
<br />APPLICANT:
<br />a Californa general partnership
<br />3315 FAIRFVIEW ROAD
<br />COSTA MESA, CA 92626
<br />CONTACT: JEFF REESE - E: reesej@southcoastplaza.com
<br />C: (714) 949.438.3250
<br />LANDSCAPE
<br />ARCHITECT: D P - Conceptual Design & Planning
<br />a Californa general partnership
<br />3195-C AIRPORT LOOP DRIVE I STUDIO ONE
<br />COSTA MESA, CA 92626
<br />CONTACT: ERIK PETERSON - E: epeterson@cdpcinc.com
<br />P: (949) 399.0870
<br />SITE TABULATION:
<br />OVERALL TABULATIONS BUILDINGS 1 - 3
<br />ARCHITECT: DRA ARCHITECTS
<br />32 EXECUTIVE PARK, SUITE 100 IRVINE, CA 92614
<br />CONTACT: CARRIE HOSHINO - E: CHOSHINO@DRA-ARCHITECTS.COM
<br />C: 949.280.8307
<br />CIVIL ENGINEER: INCLEDON CONSULTING GROUP
<br />1570 CORPORATE DRIVE, SUITE A, COSTA MESA, CA 92626
<br />CONTACT: KEVIN HADLEY - E: khadley@icgcivil.com
<br />C: 909.915.4976
<br />TYPE OF BUILDING CONSTRUCTION TYPE III-B
<br />AUTOMATIC FIRE SPRINKLERS YES
<br />ZONING DISTRICT SD - SPECIFIC DEVELOPMENT
<br />LAND USE LAKE CENTER DEV
<br />FAR ALLOWED 0.72
<br />APN(S) 414-261-01, 414-272-09, 414-272-10
<br />BUILDING OCCUPANCY S-1, F-1 AND B
<br />----------------------- -------------------------------------------------------------------------------------------------------------------------------------------------------------------
<br />WALL CONSTRUCTION Concrete Tilt -Up Walls
<br />------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
<br />ROOF CONSTRUCTION Parapet, 4-Ply "Flat -Roof"
<br />FIRE SPRINKLERED BUILDINGS YES
<br />BUILDING NO.
<br />BLDG. 1A
<br />BLDG. 1 B
<br />BLDG.1
<br />TOTAL
<br />BLDG. 2A
<br />BLDG. 2B
<br />BLDG.2
<br />TOTAL
<br />BLDG.3
<br />TOTAL
<br />TOTALS
<br />SITE AREA AC
<br />5.58
<br />5.76
<br />4.49
<br />15.8 AC
<br />SITE AREA SF
<br />243,212
<br />250,690
<br />195,408
<br />689,310 SF
<br />EXISTING BUILDING SF TO BE DEMOLISHED
<br />0
<br />117,564
<br />60,462
<br />178,026 SF
<br />TOTAL PROPOSED BUILDING AREA
<br />56,615
<br />56,115
<br />112,230
<br />60,823
<br />60,823
<br />121,645
<br />79,369
<br />313,244 SF
<br />YARD AREA
<br />4-UNLIMITED
<br />4-UNLIMITED
<br />4-UNLIMITED
<br />COVERAGE
<br />44.1 %
<br />44.5%
<br />37.0%
<br />42.3%
<br />FAR -CITY WHICH EXCLUDES MEZZANINES
<br />44.1 %
<br />44.5%
<br />37.0%
<br />42.3%
<br />FAR - INCLUDES MEZZANINES
<br />46.1%
<br />48.5%
<br />40.6%
<br />45.4%
<br />TOTAL PARKING REQUIRED
<br />164
<br />177 153
<br />494 STALLS
<br />TOTAL PARKING PROVIDED
<br />164
<br />178 155
<br />497 STALLS
<br />PARKING RATIO PROVIDED
<br />1.46
<br />1.46 1.95 1.59 RATIO
<br />OUTDOOR COVERED PATIO AREA
<br />1,210
<br />1
<br />1 707
<br />895
<br />29812
<br />SF
<br />9,915 9,915 9,915
<br />1ST FLOOR
<br />53,615
<br />53,615
<br />107,230
<br />55,823
<br />55,823
<br />111,645
<br />72,369
<br />2915244 SF
<br />Office
<br />2,500
<br />2,500
<br />5,000
<br />5,000
<br />5,000
<br />10,000
<br />7,000
<br />22,000 SF
<br />Manufacturing
<br />23,615
<br />23,615
<br />47,230
<br />23,323
<br />23,323
<br />46,645
<br />60,369
<br />1545244 SF
<br />Warehouse
<br />27,500
<br />27,500
<br />55,000
<br />27,500
<br />27,500
<br />55,000
<br />5,000
<br />115,000 SF
<br />MEZZ FLOOR- Office (includes stairs and 2-story volume lobby
<br />3,000
<br />0
<br />5,000
<br />5,000
<br />5,000
<br />10,000
<br />7,000
<br />22,000 SF
<br />TOTAL
<br />56,615
<br />53,615
<br />112,230
<br />60,823
<br />60,823
<br />121,645
<br />79,369
<br />313,244 SF
<br />PARKING REQUIRED
<br />% OF OFFICE IN BUILDING
<br />8.91%
<br />16.44%
<br />17.64%
<br />OFFICE MAY USE MANUFACTURING PARKING
<br />RATIO (2/1000), IF LESS THAN 30% OFFICE
<br />9
<br />18
<br />26
<br />53 STALLS
<br />OFFICE MAY USE WAREHOUSE PARKING RATIO
<br />(1/1000), IF LESS THAN 30% OFFICE
<br />5
<br />11
<br />1
<br />17 STALLS
<br />MANUFACTURING @ 2/1000
<br />94
<br />93
<br />121
<br />308 STALLS
<br />WAREHOUSE @ 1/1000
<br />55
<br />55
<br />5
<br />115 STALLS
<br />TOTAL REQUIRED PARKING
<br />164
<br />177
<br />153
<br />494 STALLS
<br />PARKING PROVIDED
<br />STANDARD STALL (8'-6"w. X 18'd.)
<br />146
<br />158
<br />138
<br />442 STALLS
<br />VAN ACCESSIBLE STALL (9'w. X 18'd. + 8'w. aisle)
<br />3
<br />2
<br />1
<br />6 STALLS
<br />STANDARD ACCESS.STALL (9'w. X 18'd. + 5'w. aisle)
<br />3
<br />6
<br />5
<br />14 STALLS
<br />ELECTRIC VEHICLE (EV) (6%)
<br />EV STANDARD STALL
<br />10
<br />10
<br />9
<br />29 STALLS
<br />EV VAN ACCESSIBLE STALL (12'w. X 18'd. + 5'w.
<br />aisle)
<br />1
<br />1
<br />1
<br />3 STALLS
<br />EV STANDARD ACCESS.STALL (9'w. X 18'd. + 5'w.
<br />aisle)
<br />1
<br />1
<br />1
<br />3 STALLS
<br />TOTAL PROVIDED PARKING
<br />164
<br />178
<br />155
<br />497 STALLS
<br />REQ' LONG TERM BIKE PARKING (5%)
<br />8
<br />9
<br />8
<br />25
<br />REQ' SHORT TERM BIKE PARKING (5%)
<br />8
<br />9
<br />8
<br />25
<br />PROVIDED LONG TERM BIKE PARKING
<br />9
<br />10
<br />8
<br />27
<br />PROVIDED SHORT TERM BIKE PARKING
<br />9
<br />10
<br />8
<br />27
<br />CLEAR UNDER BEAM HEIGHT
<br />36'
<br />36'
<br />32'
<br />32 Executive, Suite 100
<br />Irvine, CA 92614
<br />T 949.833.3800 - F 949.833.3806
<br />THESE DRAWINGS AND/OR THE ACCOMPANYING SPECIFICATIONS AS
<br />INSTRUMENTS OF SERVICE ARE THE EXCLUSIVE PROPERTY OF THE ARCHITECT
<br />AND THEIR USE AND PUBLICATION SHALL BE RESTRICTED TO THE ORIGINAL
<br />SITE FOR WHICH THEY WERE PREPARED. RE -USE, REPRODUCTION OR
<br />PUBLICATION BY ANY METHOD, IN WHOLE OR IN IS PROHIBITED EXCEPT BY
<br />WRITTEN PERMISSION FROM THE ARCHITECT. TITLE TO THESE PLANS AND/OR
<br />SPECIFICATIONS SHALL REMAIN WITH THE ARCHITECT WITHOUT PREJUDICE.
<br />AND VISUAL CONTACT WITH THEM SHALL CONSTITUTE PRIMA FACIA EVIDENCE
<br />OF ACCEPTANCE OF THESE RESTRICTIONS.
<br />CONSULTANT:
<br />PROFESSIONAL SEAL:
<br />PROJECT TITLE
<br />South Coast
<br />Technology Center
<br />3100 Lake Center Drive
<br />Santa Ana, California
<br />APN: 414-261-01
<br />APN(S): 414-272-09; 414-272-10
<br />OWNER/ APPLICANT:
<br />.-J ■ SE E l ROM
<br />SONS
<br />C.J. Segerstrom & Sons
<br />a California general partnership
<br />3315 Fairview Road
<br />Costa Mesa, California 92626
<br />SHEET NAME
<br />TITLE
<br />SHEET
<br />NO: DATE: DESCRIPTION:
<br />2023-08-21
<br />1st Submittal Site Plan Review
<br />2024-01-22
<br />2nd Submittal Site Plan Review
<br />2024-03-08
<br />Mtg. City - Bldg. 1 Fire Access &
<br />Bldgs 2 & 3 Unlimited Area
<br />2024-04-08
<br />3rd Submittal Site Plan Review
<br />2024-04-23
<br />Slip Sheet Changes for Bldg. 3
<br />JOB NO: 22020
<br />DATE ISSUED: 2023-08-21
<br />DRAWN BY: CMH
<br />CHECK BY: CMH
<br />SHEET NO:
<br />2024-04-17 cmh
<br />
|