Laserfiche WebLink
PLANNING DEPT. NOTES: <br />I. Prior to submittal into Building Division Ulan check. address the following items: <br />A) Planning Division: <br />1) All site plan review issues must be resolved and your site plan stamped by the City's <br />Development Review Committee. <br />2) Any required discretionary actions (i.e., specific development amendment) andCEQA <br />documents must be approved. <br />3) Submit an addressing plan, including labeled unit floor plans and an excel list of all <br />addresses, for review and approval. <br />4) Submit a landscape plan, application, and required fee for review and approval. <br />5) Material samples of all proposed exterior facades will be required to be submitted for <br />review and approval. <br />II. Prior to issuance of any required building hermits. address the following items: <br />A) Planning Division: <br />1) All outstanding site plan issues must be resolved. <br />2) All required discretionary action applications shall be approved and in effect. <br />3) Any required landscape plan must be approved. <br />4) Submit details on proposed signage for review by the Planning Department, <br />5) The addressing plan must be approved. <br />III. Prior to release of utilities or a certificate of o4 cupancy. address the following items: <br />A) Planning Division: <br />1) The applicant shall contact the case planner to set up a final field inspection <br />appointment. A three-day notice is required. The project must be completed before final <br />approval can be given. The case planner must sign the building permit field card before <br />the Building Division will finalize any project. <br />2) The required landscaping shall be installed and irrigated, and any hardscape installed. <br />Planning Division: <br />2) Please note that the discretionary review and approval requires compliance with the <br />California Environmental Quality Act (CEQA). Staff will be able to determine the <br />environmental document required once the scope and site plan of the project is <br />finalized. If the project cannot be categorically exempt under CEQA the project will <br />require preparation of an Initial Study (IS) to determine the appropriate environmental <br />document for the project. The City will engage the services of a qualified <br />environmental consultant from the City's pre -approved list of consultants, at the <br />applicant's expense, including an additional administrative fee amounting to fifteen <br />(15) percent of the firm's costs for preparing the CEQA document. <br />3) Development Project Review is valid for one year. Any submittal after the one-year <br />time period, or the submittal of a different project at any time, requires the payment of <br />new fees. <br />BUILDING DEPT. NOTES: <br />I. PLANCHECK SUBMITTAL - BUILDING SAFETY DIVISION <br />A. Building Safety Division: <br />The following are general requirements. Drawings and supporting documentation <br />submitted into Building Safety Division Plan Check must show compliance. <br />1. Project shall comply with the current state building codes adopted by the City of <br />Santa Ana at the time of permit application submittal. Currently they are the 2022 <br />California Building Code (CBC), 2022 California Residential Code (CRC), 2022 <br />California Mechanical Code, 2022 California Plumbing Code, 2022 California <br />Electrical Code, 2022 California Energy Code, 2022 California Green Standards <br />Code (CALGreen) and the Santa Ana Municipal Code (SAMC). Compliance to all <br />applicable state and local codes shall be required prior to issuance of building <br />permits. <br />2. The Building Safety Division should be consulted for plan check design and <br />submittal requirements. Electrical, plumbing, mechanical, fire sprinkler systems, <br />and grading work requires separate plans, applications, fees and permits. <br />Compliance shall be made with the California Code of Regulations, Title 24, Part <br />6 requirements for energy conservation. For submittal requirements, please call <br />(714) 647-5800 and ask for a Permit Technician. Appointments can be made <br />between 8 a.m. and 12 noon to submit plans. <br />3. This review is primarily for site related issues only. <br />4. A separate grading permit shall be required for this project. The project applicant <br />should contact the Public Works Agency at (714) 647-5039 for grading plan <br />submittal and processing requirements. <br />5. A geotechnical report shall be required for this project. The report must address <br />the potential for seismically induced soil liquefaction and soil instability. <br />BUILDING CODE ANALYSIS <br />BUILDING #1: <br />- Single Story Building with Office Mezzanine <br />- Maximum Building Height - +48'-6" <br />- 111 Floor Use - B, F-1 & S-1 Occupancies <br />- Mezz. Floor Use - B Occupancy only <br />- Building Area: <br />111 Floor Office <br />5,000 s.f. <br />111 Floor Manufacturing <br />47,230 s.f. <br />1" Warehouse <br />55,000 s.f. <br />Mezz. Floor Office <br />5.000 s.f. <br />Total Building Area 112,230 s.f. <br />- Occupancy Type: <br />o Office Area - B Occupancy per Section 304 <br />o Manufacturing - F Occupancy per Section 306 <br />o Warehouse - S Occupancy per Section 311 <br />- Allowable Building Height: <br />o 75' maximum for B, F, & S Occupancy- per Table 504.3 <br />- Maximum Number of Stories: <br />o B Occupancy - 4 Stories maximum -per Table 504.4 <br />o F-1 Occupancy - 3 Stories maximum -per Table 504.4 <br />o S-1 Occupancy - 3 Stories maximum -per Table 504.4 <br />- Type of Construction: <br />o Type IIIB, Sprinklered, Single Story -Section 602.3 <br />- Basic Allowable Floor Area - per Table 506.2 <br />o B Occupancy - 76,000 s.f. <br />o F-1 Occupancy - 48,000 s.f. <br />o S-1 Occupancy - 70,000 s.f. <br />- Fire Sprinklers used for Unlimited Floor Area - per Section 507.4 <br />o Fire Sprinklers designed per NFPA 13 <br />- Unlimited Floor Area Square Footage for B, F, M and S Occupancy - per Section 507.2 J <br />507.4 <br />o Limited to one-story above finish grade <br />0 60' min side yards provided on all 4 sides of the building <br />■ North, South, East and West <br />BUILDING #2: <br />- Single Story Building with Office Mezzanine <br />- Maximum Building Height - +48'-6" <br />- 1st Floor Use - B, F-1 & S-1 Occupancies <br />- Mezz. Floor Use - B Occupancy only <br />- Building Area: <br />1st Floor Office 10,000 s.f. <br />1st Floor Manufacturing 46,645 s.f. <br />11t Warehouse 55,000 s.f. <br />Mezz. Floor Office 10,000 s_f. <br />Total Building Area 121,645 s.f. <br />- Occupancy Type: <br />o Office Area - B Occupancy per Section 304 <br />o Manufacturing - F Occupancy per Section 306 <br />o Warehouse - S Occupancy per Section 311 <br />- Allowable Building Height: <br />o 75' maximum for B, F, & S Occupancy- per Table 504.3 <br />- Maximum Number of Stories: <br />o B Occupancy - 4 Stories maximum -per Table 504.4 <br />o F-1 Occupancy - 3 Stories maximum -per Table 504.4 <br />o S-1 Occupancy - 3 Stories maximum -per Table 504.4 <br />- Type of Construction: <br />o Type IIIB, Sprinklered, Single Story -Section 602.3 <br />- Basic Allowable Floor Area - per Table 506.2 <br />o B Occupancy - 76,000 s.f. <br />o F-1 Occupancy - 48,000 s.f. <br />o S-1 Occupancy - 70,000 s.f. <br />- Fire Sprinklers used for Unlimited Floor Area - per Section 507.4 <br />o Fire Sprinklers designed per NFPA 13 <br />- Unlimited Floor Area Square Footage for B, F, M and S Occupancy - per Section 507.2 / <br />507.4 <br />o Limited to one-story above finish grade <br />0 60' min side yards provided on all 4 sides of the building <br />■ North, South, and East sides only <br />■ West side will require a "No -Build / Shared Assessment Easement" that will <br />be shared with Building #3 to maintain a 60' side yard. <br />• Per Sections 1.8.6.1, Section 1.8.6.2, 1.8.7.1, 1.8.7.2 and 1.8.7.3 <br />BUILDING #3: <br />- Single Story Building with Office Mezzanine <br />- Maximum Building Height - +48'-6" <br />- 1st Floor Use - B, F-1 & S-1 Occupancies <br />- Mezz. Floor Use - B Occupancy only <br />- Building Area: <br />111 Floor Office 7,000 s.f. <br />111 Floor Manufacturing 60,369 s.f. <br />111 Warehouse 5,000 s.f. <br />Mezz. Floor Office 7,000 s.f. <br />Total Building Area 79,369 s.f. <br />- Occupancy Type: <br />o Office Area - B Occupancy per Section 304 <br />o Manufacturing - F Occupancy per Section 306 <br />o Warehouse - S Occupancy per Section 311 <br />- Allowable Building Height: <br />o 75' maximum for B, F, & S Occupancy- per Table 504.3 <br />- Maximum Number of Stories: <br />o B Occupancy -4 Stories maximum - per Table 504.4 <br />o F-1 Occupancy - 3 Stories maximum -per Table 504.4 <br />o S-1 Occupancy - 3 Stories maximum -per Table 504.4 <br />- Type of Construction: <br />o Type IIIB, Sprinklered, Single Story -Section 602.3 <br />- Basic Allowable Floor Area - per Table 506.2 <br />o B Occupancy - 76,000 s.f. <br />o F-1 Occupancy - 48,000 s.f. <br />o S-1 Occupancy - 70,000 s.f. <br />- Fire Sprinklers used for Unlimited Floor Area - per Section 507.4 <br />o Fire Sprinklers designed per NFPA 13, Moderate Hazard <br />- Unlimited Floor Area Square Footage for B, F, M and S Occupancy - per Section 507.2 / <br />507.4 <br />o Limited to one-story above finish grade <br />o Required min. 60' side yards provided on all 4 sides of the building. <br />■ 60' min. side yards per Section 507.4 <br />• South, Partial North, Partial East and Partial West sides of the <br />Building. <br />■ Reduce to 40' min. yard - per Section 507.2.1 <br />• Exterior walls are required to be 3-hour fire rated <br />• Allowed exterior openings are required to be protected not less <br />than 3-hours <br />0 67' of the North side on the North/East Corner <br />0 101' of the East side on the North/East Corner <br />0 18' of the West Side at the North/West Corner <br />32 Executive, Suite 100 <br />Irvine, CA 92614 <br />T 949.833.3800 - F 949.833.3806 <br />THESE DRAWINGS AND/OR THE ACCOMPANYING SPECIFICATIONS AS <br />INSTRUMENTS OF SERVICE ARE THE EXCLUSIVE PROPERTY OF THE ARCHITECT <br />AND THEIR USE AND PUBLICATION SHALL BE RESTRICTED TO THE ORIGINAL <br />SITE FOR WHICH THEY WERE PREPARED. RE -USE, REPRODUCTION OR <br />PUBLICATION BY ANY METHOD, IN WHOLE OR IN IS PROHIBITED EXCEPT BY <br />WRITTEN PERMISSION FROM THE ARCHITECT. TITLE TO THESE PLANS AND/OR <br />SPECIFICATIONS SHALL REMAIN WITH THE ARCHITECT WITHOUT PREJUDICE. <br />AND VISUAL CONTACT WITH THEM SHALL CONSTITUTE PRIMA FACIA EVIDENCE <br />OF ACCEPTANCE OF THESE RESTRICTIONS. <br />CONSULTANT: <br />PROFESSIONAL SEAL: <br />PROJECT TITLE <br />South Coast <br />Technology Center <br />3100 Lake Center Drive <br />Santa Ana, California <br />APN: 414-261-01 <br />APN(S): 414-272-09; 414-272-10 <br />OWNER/ APPLICANT: <br />C.J. Segerstrom & Sons <br />a California general partnership <br />3315 Fairview Road <br />Costa Mesa, California 92626 <br />SHEET NAME <br />NOTES <br />NO: DATE: DESCRIPTION: <br />2023-08-21 <br />2024-01-22 <br />1st Submittal Site Plan Review <br />2nd Submittal Site Plan Review <br />2024-03-08 <br />Mtg. City - Bldg. 1 Fire Access & <br />Bldgs 2 & 3 Unlimited Area <br />2024-04-08 <br />3rd Submittal Site Plan Review <br />2024-04-23 <br />Slip Sheet Changes for Bldg. 3 <br />JOB NO: 22020 <br />DATE ISSUED: 2023-08-21 <br />DRAWN BY: CMH <br />CHECK BY: CMH <br />SHEET NO: <br />