My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLACEWORKS, INC. (10)
Clerk
>
Contracts / Agreements
>
P
>
PLACEWORKS, INC. (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2024 5:05:33 PM
Creation date
8/12/2024 5:05:16 PM
Metadata
Fields
Template:
Contracts
Company Name
PLACEWORKS, INC.
Contract #
A-2023-194-04A
Agency
Planning & Building
Council Approval Date
11/7/2023
Expiration Date
11/7/2028
Insurance Exp Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A g PLACEWORKS <br /> July-9-2024 <br /> Ali Pezeshkpour, AICP <br /> Planning Manager <br /> City of Santa Ana <br /> Planning and Building Agency <br /> 20 Civic Center Plaza <br /> Santa Ana, CA 92701 <br /> Subject: Proposal to provide CEQA Environmental Planning Services to the City of <br /> Santa Ana for the Short-Term Rentals Ordinance Project <br /> Understanding of the Project <br /> The City desires to adopt an ordinance to expressly prohibit short-term rentals within the City, to <br /> reaffirm existing law. <br /> The SAMC does not list short-term rentals as an approved use in any zoning district, <br /> making them prohibited and unauthorized under the current enforcement practice afforded <br /> by Section 41-190(a). <br /> For the purposes of CEQA, we are recommending tiering off the City of Santa Ana (City) <br /> General Plan Update (GPU) Environmental Impact Report (EIR) (GP EIR); therefore, the <br /> buildout identified in Table LU-2, Buildout Table, will be considered the approved project <br /> environmental baseline (existing conditions) of the project site, and the proposed project's <br /> impacts will be analyzed against this baseline. Based on an initial review of the GP EIR <br /> and the information available about the City's intended ordinance, PlaceWorks believes <br /> the tiering approach would yield an EIR Addendum. The EIR Addendum may also include <br /> a discussion regarding the proposed project's qualification for an exemption. If determined <br /> to qualify for an exemption, an analysis showing that use of the exemption is not precluded <br /> by the exceptions outlined in CEQA guidelines section 15300.2 will also be included. The <br /> exceptions address issues of location, cumulative impact, significant affect, scenic <br /> highways, hazardous waste sites, and historical resources. <br /> Approach <br /> PlaceWorks will use the City's EIR Addendum template as a guide to evaluate the proposed <br /> project against the GPU and GP EIR. This proposal covers the preparation of the ER <br /> Addendum to evaluate the proposed project compared to the existing General Plan and <br /> GP EIR. <br /> Scope of Work <br /> The following scope includes completion of each step of CEQA processing to ensure <br /> compliance with CEQA. <br /> 3 MacArthur Place, Suite 1100 I Santa Ana, California 92707 714.966.9220 I PlaceWorks.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.