Laserfiche WebLink
PLACEWORKS <br /> TASK 1. PROJECT-DESCRIPTION <br /> PlaceWorks will prepare the project description for review by the City after the kick-off <br /> meeting. Concurrent with the preparation of the project description, PlaceWorks will <br /> prepare the administrative draft Addendum.We assume that the project description is fixed <br /> as discussed, but can adjust the analysis if changes are made during preparation of the <br /> Addendum. Parallel review of the Project Description and the Addendum is needed to meet <br /> the schedule. We understand that review and edit will be an iterative process and will work <br /> with the City to incorporate reviews as they occur. We prefer to work in Microsoft Word to <br /> enable all reviewers to make comment(s) and edits in track change mode. This shortens <br /> the edit timing and ensures the final product reflects the needs of the City. Although we fully <br /> understand the extent of the project, if the details of the project description change <br /> significantly, additional budget may be necessary. <br /> Deliverable(s): <br /> » Project Description (electronic copy only Word) <br /> TASK 2. EIR ADDENDUM <br /> 2.1 Administrative Draft EIR Addendum <br /> Using the agreed upon formatforthe Addendum, PlaceWorks will prepare an administrative <br /> draft for review. The administrative draft Addendum will: <br /> » Focus on the proposed changes compared to the approved project. <br /> » Determine if there are any effects peculiar to the project that were not <br /> originally evaluated. <br /> » Perform a Section 15162 analysis and determine whether a subsequent EIR is <br /> required. <br /> » Include a qualitative discussion of the proposed project's impacts related to air <br /> quality, energy, greenhouse gas, noise, and transportation. <br /> The Addendum will include a discussion that compares the proposed project to the GP EIR. <br /> We will include findings of the environmental effects of the proposed project compared to <br /> the GP EIR.We will rely on and make use of the analysis and mitigation measures in the GP <br /> and GP EIR. Please note that, unlike other CEQA documents (e.g., EIR, MND), an <br /> Addendum does not require a public review period. Also, an Addendum does not require <br /> Assembly Bill (AB) 52 tribal consultation. <br /> The completed Administrative Draft Addendum will be submitted to the City for review and <br /> comment in Microsoft (MS) Word. As noted above, we anticipate an accelerated delivery <br /> date and an iterative review process to meet the schedule. <br /> Deliverable(s): <br /> » Administrative Draft Addendum (electronic copy only Word) <br /> 2.2 Final Draft EIR Addendum <br /> PlaceWorks will submit an electronic version of the Screencheck Final EIR Addendum for <br /> City review. It is assumed that comments will be manageable and not result in large-scale <br /> restructuring or revisions to the Final EIR Addendum. <br /> July 9,2023l Page <br />