Laserfiche WebLink
ASCE 41 Structural Evaluation and Scoping <br />Our team will provide an ASCE 41 Tier 1 and Tier 2 <br />analysis for the determination of the ability for the <br />intended plaza structure to be partially removed and <br />to determine what potential strengthening would be <br />required. <br />We will analyze the hazardous material documentation <br />Provided by the City to determine if any additional <br />testing is required and will develop a mitigation plan for <br />this material. <br />Utilizing as -built plans provided by the City, project base <br />drawings of the State Building to be demolished and <br />the Plaza will be prepared. Base drawings will consist <br />of floor plans, RCPs, and exterior elevations as well as <br />the capping and rerouting of any building water, sewer, <br />and irrigation lines. The demolition plan wit[ include the <br />main switchgear as well. <br />We shall prepare up to three alternate site Layouts for <br />new interim parking, vehicular, pedestrian circulation, <br />and landscape for review and selection of the preferred <br />alternative by the Working Client Group. This new <br />design will include outdoor rated switchgear and <br />distribution system to power new outdoor Lighting <br />as well as design for an outdoor rated UPS/invertor <br />system for emergency lighting. <br />Our team will meet with the Authorities Having <br />Jurisdiction to scope out the permit procedures and <br />submission requirements. <br />Estimate <br />With a full understanding of the current market, cost of <br />materials, and capabilities of the local trade contracting <br />community, our estimating team can provide the City of <br />Santa Ana with estimates within 2% of the actual cost. <br />Initial Budget/ Control Estimate <br />Upon completion of the drawings, Bernards' in-house <br />experts prepare an initial estimate, or control estimate, <br />to develop a baseline budget. <br />Progressive Estimate <br />To prevent rising costs and scope creep while staying <br />true the project's goals, Bernards can prepare <br />progressive estimates based on the design's current <br />state and compare it to the control estimate. Any <br />deviations are discussed and resolved as a team. <br />Value Engineering and Constructability Reviews <br />From innovative material applications to strategic <br />construction methods, we explore cost -saving <br />alternatives while maintaining aesthetic intent and <br />project objectives. <br />Elevating Projects and Reducing Costs with the Value <br />Engineering Process <br />In partnership with the ownership, design teams, and <br />trade partners, we evaluate the life cycle costs of <br />building components, systems, and materials to provide <br />design options that balance the budget. <br />Improving Document Quality with Constructability <br />Reviews <br />No single factor influences the number and value of <br />field changes more than the quality of the contract <br />documents. Bernards collaborates with the design <br />team to enhance the project drawings and minimize <br />RFIs by eliminating errors, ambiguities, and items <br />vulnerable to interpretation. <br />Evaluations in the preconstruction phase result in <br />controlled quality during construction and closeout for <br />clear, consistent, and complete contract documents. <br />Publicly Bidding Out Construction Trades by <br />Division <br />Bernards publicly bids out the project by developing <br />a targeted list of the local area's most qualified <br />contractors. We cult this list from our in-house data <br />base of thousands of trade contractors that meet <br />Bernards' standards of quality, safety, and financial <br />stability. <br />Pursuant to City of Santa Ana Charter Section 421 and <br />Santa Ana Municipal Code Section 2-600 through 2-809, <br />Bernards will be responsible for 1) developing the <br />advertisement draft, featuring the project's description <br />and pre -bid conference dates; and 2) assisting with <br />the advertisement's placement in local trade and DBE <br />industry publications. <br />The project team assists our Estimating department <br />with phone calls to obtain 3 to 5 competitive bids per <br />trade, resulting in the highest quality performance for <br />the best prices. <br />RFQ ND,: 24-032 i State BuAding Demolition Project <br />