My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 36 - Resolution, Agreement, and Appropriation Adjustment Accepting the FY 2023 Emergency Management Performance Grant
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
08/20/2024
>
Item 36 - Resolution, Agreement, and Appropriation Adjustment Accepting the FY 2023 Emergency Management Performance Grant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:49:20 AM
Creation date
8/21/2024 12:19:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
36
Date
8/20/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. A qualitative narrative summary of the impact of those accomplishments throughout the entire <br />POP submitted to the respective FEMA Preparedness Officer; and <br />5. Other documents required by program guidance, NOFOs, appendices to this Manual, terms and <br />conditions of the award, or other FEMA guidance. <br />In addition, any recipient that issues subawards to any subrecipient is responsible for closing out those <br />subawards as described in 2 C.F.R. § 200.344; subrecipients are still required to submit closeout materials <br />within 90 days of the subaward POP end date. When a subrecipient completes all closeout requirements, <br />pass -through entities must promptly complete all closeout actions for subawards in time for the recipient <br />to submit all necessary documentation and information to FEMA during the closeout of their prime <br />award. <br />After the prime award closeout reports have been reviewed and approved by FEMA, a closeout notice <br />will be completed to close out the grant. The notice will indicate the POP as closed, list any remaining <br />funds that will be deobligated, and address the requirement of maintaining the award records for at least <br />three years from the date of the final FFR. The record retention period may be longer than three years due <br />to an audit, litigation, for equipment or real property used beyond the period of performance or other <br />circumstances outlined in 2 C.F.R. § 200.334. <br />Recipients are responsible for refunding to FEMA any balances of unobligated cash that FEMA paid that <br />are not authorized to be retained per 2 C.F.R. § 200.344(d). <br />Administrative Closeout <br />Administrative closeout is a mechanism for FEMA to unilaterally move forward with closeout of an <br />award using available award information in lieu of final reports from the recipient per 2 C.F.R. § <br />200.344(h)-(i). It is a last resort available to FEMA, and if FEMA needs to administratively close an <br />award, this may negatively impact a recipient's ability to obtain future funding. This mechanism can <br />also require FEMA to make cash or cost adjustments and ineligible cost determinations based on the <br />information it has, which may result in identifying a debt owed to FEMA by the recipient. <br />Wh e n a r e c i p i e n t i s n o t r e s p o n s i v e t o F EMA' s r e a <br />complete the standard closeout process, FEMA is required under 2 C.F.R. § 200.344(h) to start the <br />administrative closeout process within the regulatory timeframe. FEMA will make at least three written <br />attempts to collect required reports before initiating administrative closeout. If the recipient does not <br />submit all required reports in accordance with 2 C.F.R. § 200.344, the relevant program NOFO, this <br />Manual, and the terms and conditions of the award, FEMA must proceed to administratively close the <br />award with the information available within one year of the POP end date. Additionally, if the recipient <br />does not submit all required reports within one year of the POP end date, per 2 C.F.R. § 200.344(i), <br />FEMA must r e p o r t i n F AP I I S t h e r e c i p i e n t' s ma t e r <br />the award. <br />If FEMA administratively closes an award where no final FFR has been submitted, FEMA uses that <br />administrative closeout date in lieu of the final FFR submission date as the start of the three-year record <br />retention period under 2 C.F.R. § 200.334. <br />In addition, if an award is administratively closed, FEMA may decide to impose remedies for <br />noncompliance per 2 C.F.R. § 200.339, consider this information in reviewing future award applications, <br />or apply special conditions to existing or future awards. <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.