My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ICF INCORPORATED, LLC
Clerk
>
Contracts / Agreements
>
I
>
ICF INCORPORATED, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2024 5:39:12 PM
Creation date
8/26/2024 4:20:28 PM
Metadata
Fields
Template:
Contracts
Company Name
ICF INCORPORATED, LLC
Contract #
A-2024-119
Agency
Public Works
Council Approval Date
8/6/2024
Expiration Date
8/5/2027
Insurance Exp Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
References <br />CITY OF SANTA ANA <br />ATTACHMENT B <br />List and describe fully the contracts performed by your firm which demonstrate your ability to provide the supplies, <br />equipment or services included in the scope of the proposal specifications. Attach additional pages if required. The <br />City reserves the right to contact each of the references listed for additional information regarding your firm's <br />qualifications. <br />REFERENCEI <br />Customer Name: City of Lodi Contact Individual: Melissa Price <br />Address:1331 S. Ham Ln., Lodi, CA 95242 Phone Number: 209.333.6811 <br />EMAIL: mprice(a)lodi.gov <br />Contract Amount: $87,000 Year: 06/2022 - 06/2023 <br />Description of supplies, equipment, or services provided:The City of Lodi has a fleet of more than 240 vehicles spanning <br />across various vehicle types and use cases (e.g., bucket trucks, digger derricks, vac trucks, etc.). ICF supported the City to <br />develop an EV replacement and infrastructure plan as the City plans to transition its fleet to zero emission vehicles in <br />response to CARB's upcoming Advanced Clean Fleet (ACF) regulation. As part of this project, ICF developed a Phased <br />Master Plan for the City to: 1) evaluate the City's fleet and provide recommendations to transition from fossil fuel vehicles to <br />electric options; 2) deploy EV charging stations for public fleet vehicles; 3) assess City facilities' Capacity to support additional <br />electrical load from charging operations; 4) estimate costs of the transition including vehicle replacement, infrastructure <br />deployment, and operations; 5) highlight barriers to fleet conversion (e.g., technology availability, operational challenges) and <br />strategies to overcome them; and identified potential innovative funding and financing sources to facilitate the transition to <br />EVs and deploy charging infrastructure. <br />REFERENCE <br />Customer Name: City of Laguna Beach Contact Individual: Michael Litschi <br />Address: 505 Forest Ave., Laguna Beach, CA 92651 Phone Number: 949.497.0303 <br />EMAIL: mlitschiCG)a lagunabeachcitv.net <br />Contract Amount: $78,000 Year: 05/2022- 05/2023 <br />Description of supplies, equipment, or services provided: Transportation is a significant contributor to greenhouse gas (GHG) <br />emissions and air pollution in the City of Laguna Beach. The City's fleet currently has approximately 122 vehicles, of which 85 <br />are powered by gasoline, 20 are powered by diesel, and 17 are powered by propane. Transitioning this fleet to EVs can <br />significantly reduce the City's carbon footprint, clearly demonstrate the City's leadership in and commitment to clean <br />transportation and sustainability, and support the City's climate action plan (CAP). ICF supported the City in developing an EV <br />Fleet and Charging Station Master Plan. In this plan, ICF evaluated the City's fleet and provided recommendations for <br />transition from internal combustion engine (ICE) vehicles to clean transportation alternatives; developed EV charging <br />infrastructure strategies for City fleet vehicles; provided guidance on decommissioning unnecessary propane and fossil fuel <br />infrastructure; evaluated opportunities to install EV charging stations at City facilities that are available to the public; and <br />identified potential funding sources and financing models to facilitate the City's EV transition. <br />REFERENCE <br />Customer Name: City of Pittsburg, CA <br />Address: 65 Civic Ave., Pittsburg, CA 94565 <br />Contact Individual: John Samuelson <br />Phone Number: 925.252.4271 <br />EMAIL: isamuelsoriftiltsbumca.gov <br />Contract Amount: $106,000 Year: 02/2022-06/2024 <br />Description of supplies, equipment, or services provided: ICF is supporting the City of Pittsburg in its quest to transition to the <br />use of zero emission vehicles (ZEVs). The goal of this project is to create a comprehensive master plan to establish a robust, <br />future -proof charging network that would be capable of catering to the needs of the city's entire fleet. The plan is designed to <br />adapt to an increase in the number of fleet vehicles in the future. Over the next decade, the plan will guide the City through the <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.