Laserfiche WebLink
conversion process of existing and additional fleet vehicles. The analysis will delineate the specific number, types, and <br />locations of the EVSE required to support the transition to a fully electrified fleet. It will also provide a detailed breakdown of the <br />associated costs and the proposed schedule for deployment. The plan goes beyond setting up charging infrastructure. It will <br />also lay out detailed plans for each city facility, identify prospective maintenance needs and costs for EVSE, and highlight any <br />necessary upgrades for the electrical system and grid. It is not only a deployment guide but also a roadmap for the continued <br />efficient management of the fleet. In addition, the plan will include recommendations and guidelines for fleet management and <br />best practices for the maintenance of EVs and EVSE. It will address contingency situations by providing a strategy for an <br />emergency charging plan during unexpected power outages. <br />THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. <br />PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. <br />Umartli dn.a d Aare mnLined an 11tls xhamIs m0,'t N IDe rasvia.. We liNe'x of W. npMsal <br />20 <br />