My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ICF INCORPORATED, LLC
Clerk
>
Contracts / Agreements
>
I
>
ICF INCORPORATED, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2024 5:39:12 PM
Creation date
8/26/2024 4:20:28 PM
Metadata
Fields
Template:
Contracts
Company Name
ICF INCORPORATED, LLC
Contract #
A-2024-119
Agency
Public Works
Council Approval Date
8/6/2024
Expiration Date
8/5/2027
Insurance Exp Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2015-2018), Duke Energy (2018-2019), Ameren Missouri (2018-2019), JEA (2014—Present), Entergy (2016— <br />Present), and the Salt River Project (2017—Present). <br />NY State EVSE Data Collection and Site Verification Support, New York State Energy Research and <br />Development Authority (NYSERDA), 2021-Present. <br />DCFC Program Administration Lead. Ambika leads ICF's support of NYSERDA's DCFC Program by coordinating <br />application and site reviews. Provides ongoing program management support, progress reports, and program <br />analytics. <br />Beneficial Electrification Opportunity Assessments, Multiple Utility Clients, U.S., 2014—Present. <br />Technical and Modeling Lead. Ambika led or provided subject matter expertise on 18 utility beneficial electrification <br />opportunity assessments across diverse geographies. She continues to refine and develop ICF's opportunity <br />assessment process by expanding ICF's technology library to over 80 non -road and on -road equipment types, <br />updating the cost -benefit analysis model to accommodate standard energy industry cost-effectiveness tests, and <br />standardizing implementation plan recommendations. She has helped utilities navigate regulatory frameworks and <br />supported four clients in submitting proposals and technical workpapers with their public service commissions to <br />implement beneficial electrification programs. Clients have included JEA (2014, 2019), Entergy (2015), Alliant Energy <br />(2015), the Salt River Project (2017), Ameren (2017), the Public Service Company of Oklahoma (2017), Duke Energy <br />(2018), CenterPoint Energy (2019), American Electric Power West Virginia (2019), PacifiCorp (2019), CPS Energy <br />(2019), SaskPower (2020), North Carolina's Electric Cooperatives (2020), Liberty Utilities (2020-2021), Evergy <br />(2021), and Cleco Power (2021). <br />Electrification Potential Study for Canada, Natural Resources Canada, 2020-2021. <br />Model Architect and Technology Subject Matter Expert. Ambika supported the development of a systematic, <br />informed approach to planning and prioritizing future programs and policies to encourage beneficial electrification <br />across Canada. She managed the development of the technical assumptions and market potential for 56 on -road <br />and non -road vehicle measures. <br />Airport Ground Support Equipment (GSE) Study, AirPro Finland, Finland, 2019. <br />Technical Expert. Ambika conducted a global energy and emission impact study of airport ground support <br />equipment for the second largest ground handler company in Finland. She provided technology assessment and <br />emission reduction methodology guidance and expertise. <br />Use or Utsolu»a'm of dap"Fibined on thla sh,Mi s404 n thoraA h. au1h. WI. paAo of this peaPosal <br />
The URL can be used to link to this page
Your browser does not support the video tag.