Laserfiche WebLink
3ANTA ANA .00pv^� —_ <br />� <br />2 <br />2 <br />z <br />4 <br />5 <br />� <br />� <br />8 <br />� <br />IQ <br />II <br />12 <br />IJ <br />14 <br />I5 <br />16 <br />117 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />AGREEMENT <br />THIS AGREEMENT, mad* and entered into this l%th day of <br />April lg 55 ' BY AND BETWEEN CITY OF SANTA ANA, a <br />municipal corporation, hereinafter <br />designated as ''SANTA ANA'.' <br />CITY OF GARDEN GROVE, a municipal <br />corporation, hereinafter designated <br />as'GARDEN GROVE./ <br />RECITALS <br />Considerable traffic congestion presently exists and is progressively <br />increasing at the intersection ofFairview Street and Trask Avenue. <br />A study has been completed and the conclusion drawn that traffic <br />conditions at said Intersection warrant the installation of o traffic <br />signal and intersection lighting system for the proper and orderly move- <br />ment of traffic. <br />GARDEN GROVE is willing to cooperate with 3ANT8 ANA In the Installation <br />of the traffic signal and intersection lighting system, and GARDEN GROVE Is <br />willing to cooperate with SANT8 ANA 'in these matters and contribute to <br />the maintenance of said system subsequent to their installation; <br />The intersection is to be improved with a traffic signal and inter- <br />section lighting system and associated road *mrk. Said work of Improve- <br />ment shall be referred to hereinafter as the Project~ <br />NOW THEREFORE IT IS AGREED by the parties hereto as follows: <br />l° SANTA ANA SHALL; <br />A. Prepare the detailed plans^ specifications and estimate for the <br />Project. <br />B" Prepare map and deed for all necessary additional right of way~ <br />C. Have jurisdiction of the construction area within SANTA ANA and <br />GARDEN SK0VE, <br />D. Be and is hereby designated as the contracting and construction <br />agent for the parties to do and perform all acts and things <br />necessary or required in order to construct the Project in <br />accordance with the plans and specifications, |nciuding material <br />� <br />