My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GARDEN GROVE, CITY OF (17)
Clerk
>
Contracts / Agreements
>
G
>
GARDEN GROVE, CITY OF (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 9:01:25 AM
Creation date
8/29/2024 12:04:52 PM
Metadata
Fields
Template:
Contracts
Company Name
GARDEN GROVE, CITY OF
Contract #
A-1966
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�j <br />III control, inspection of the construction work, and to execute and <br />�I <br />2 1 deliver all documents necessary or required in connection with the <br />3 construction and completion of said Project, including certificate <br />4 of day labor, equipment and material costs, and certification of <br />5I completion Jon of the Project, <br />6I� p <br />j 2.,. GARDEN GROVE .SHALL; <br />7! A. Approve plans and specifications as to design and construction <br />2II <br />) features affecting the construction operation and maintenance <br />lit <br />9 of the portion of the Project within GARDEN GROVE <br />1a it <br />�I B— Approve map and deed of right—of—way and make all the necessary <br />11 arrangements to acquire the right—of—way for its portion of the <br />it <br />I2� Project and shad, by appropriate Resolution of the Glty Council <br />it <br />so certify to SANTA AKA, prior to the SANTA ANA G,17Y COl NC4L <br />�l <br />1411 approving the Project plans and specifications, that such <br />�I <br />[�I <br />15 <br />acquisition has been accomplished. <br />Cam, At all times during the progress of construction of the Project <br />7' have access to the work for the purpose of inspection thereof <br />and should GARDEN GROVE deem any remedial measures to be <br />1,9j i <br />necessary, GARDEN GROVE shall notify SANTA ANA thereof.. <br />261) Upon completion of the Project, any and all road work necessary in <br />21 connection with the Project shall be paid for by the respective parties <br />22) on the basis of the actual work done within the 1-imits of their respective <br />it <br />23 jurisdictions,, <br />24 4a. Upon completion of the Project, GARDEN GROWS share of the traffic <br />r I€ <br />2 of signal and intersection lighting system installation will be determined <br />261 <br />� in the same ratio to the total cost of such system as the number of <br />27i legs under GARDEN GROVES jurisdiction entering the intersection are to <br />E <br />281 the total number of n Legs entering the intersectio I` <br />5� For the purpose of determining the proportionate share of the Project <br />[ costs to be borne by the respective parties hereto the C.limits of <br />GARDEN GROVE and the number of legs entering the intersection under the <br />-52 <br />;i <br />2 - <br />iI <br />3S <br />
The URL can be used to link to this page
Your browser does not support the video tag.