My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GARDEN GROVE, CITY OF (18)
Clerk
>
Contracts / Agreements
>
G
>
GARDEN GROVE, CITY OF (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 9:01:28 AM
Creation date
8/29/2024 12:05:28 PM
Metadata
Fields
Template:
Contracts
Company Name
GARDEN GROVE, CITY OF
Contract #
A-1970
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c . To bear the City of Santa Ana's share of the construction <br />costs required to complete the traffic control system and highway lighting <br />referred to herein, such share to be three -fourths (3/11) of the total con- <br />struction costs. <br />d. To acquire and pay for all, costs involved in securing E1-1 <br />rights of way and to pay for all costs for all road work within the City of <br />Santa Ana necessary for the construction of the traffic control signal system <br />and highway lighting, <br />e, City of Santa Ana shall maintain and operate the entire traffic <br />control signal system and highway ligbting as constructed. <br />f. City of Santa Aria will relocate traffic signal equipment as <br />required in the future by further development of adjacent properties either <br />within the City Limits of Santa Ana, or Garden Grove. <br />SECTION II <br />For and in consideration of the covenants and conditions to be <br />kept and performed by the City of Santa Ana as set forth. in this Agreement, <br />-the City of Garden Grove agrees: <br />a. To reimburse City of Santa Ana promptly upon -rendition of <br />statement therefor, City of Garden Grove's share of expense of preparation of <br />plans and specifications, construction engineering costs and construction costs <br />required to complete the traffic control signal. system and highway lighting, <br />such share to be one-fourth (1/4) of the total preliminary and construction <br />engineering costs and construction costs. <br />b. To reimburse the City of Santa Ana promptly upon rendition <br />of statement therefore, City of Garden. Grove's share one-fourth (1/4) of the <br />total subject intersection's traffic signal system and intersection lighting <br />maintenance and operational expenses. <br />C. To acquire and pay for all costs involved in securing all <br />rights of way and to pay all costs for all road work within the City of Garden <br />Grove necessary for the construction of the traffic control signal, system and <br />highway lighting, <br />
The URL can be used to link to this page
Your browser does not support the video tag.