Laserfiche WebLink
LEVEL I - 810,000 square feet <br />1A2 <br />Provide eastbound widening on MacArthur to form the <br />160,000 <br />continuation of the number 3 eastbound lane, east of <br />Hutton Center Drive directly into the southbound SR-55 <br />on -ramp eliminating the current "pinch". <br />1C <br />Complete Columbine widening to four lanes including landscaped <br />340,000 <br />median, street lights, sidewalk & parkway landscaping. <br />1N* <br />At southeast corner Main/MacArthur intersection, add a northbound right <br />200,000 <br />turn lane. Right-of-way and construction costs are to be shared with <br />Hutton Center Development. <br />2A1 & 2A2 <br />Route the southbound SR-55 off -ramp, desiring to travel west <br />300,000 <br />west on MacArthur Blvd. through an enlarged signalized inter- <br />section rather than long the existing right -turn diagonal roadway. <br />These improvements will require the addition of two lanes and <br />the modification of the traffic signal. These improvements will <br />require Caltrans approval. <br />2D <br />Widen MacArthur Blvd. to add a third westbound lane between <br />400,000 <br />the southbound SR-55 Freeway off -ramp and the full width <br />improvement east of Imprerial Promendade. Resurface/reconstruct the <br />westbound lanes on MacArthur Blvd. between Main Street and the <br />southbound SR-55 off -ramp per the material report. This work must <br />be coordinated with Caltrans and may need to be constructed <br />in two phases. <br />IL <br />At SR-55 northbound off -ramp to Dyer add a third lane to off -ramp. <br />100,000 <br />2E <br />Provide a minor signal modification by installing traffic loops and <br />50,000 <br />signal heads and restriping on the northbound approach of Hutton <br />Centre Drive at MacArthurto create a dual northbound right -turn lane <br />and right -turn signal overlap. <br />On -site improvements: <br />1,427,537 <br />Cap First American Way with asphalt concrete between Imperial <br />Promenade and existing terminus. Construct storm drain from Orange <br />County Flood Control Channel to Columbine and between First American <br />Way and Orange County Flood Control Channel; reactivate traffic signal <br />at First American Way and Imperial Promenade including loops on west- <br />bound approach, signal modification to provide northbound right turn <br />overlap with westbound left turn and restriping; construct First American <br />between existing terminus and Columbine and Majestic between <br />Majestic East and First American Way**. The construction of First <br />American Way and Majestic shall include four lanes, landscaped <br />medians, street lights, sidewalks and parkway landscaping. <br />`fi 5 .`_♦ :Y k .' �y �. �W }, �eh S N �`�Y4 f�_. - <br />SUBTOTAL-.. <br />.{;3.5$^J',4'���!�Qi <br />.S'.'.tN.'-0�[V,L/VD <br />14-Aug-98 <br />ATTACHMENT ".C" <br />PAGE 1 of 2 <br />George1Fatco.xls <br />