My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES, INC. (4)
Clerk
>
Contracts / Agreements
>
M
>
MARIPOSA LANDSCAPES, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 11:14:24 AM
Creation date
9/6/2024 11:11:36 AM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPES, INC.
Contract #
A-2024-132
Agency
Public Works
Council Approval Date
8/20/2024
Expiration Date
12/31/2027
Insurance Exp Date
6/15/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) <br />CITY OF SANTA ANA <br />All leaking or defective piping, valves, or other system components shall be repaired within <br />twenty-four (24) hours of detection. <br />Particular attention shall be paid to all slope areas, which will, by physical nature, provide for <br />greatest potential runoff, which can contribute to erosion. <br />Contractor shall turn off controllers when adequate rainfall is anticipated. <br />In the event of irrigation system failure, manual watering required to keep the plant material in a <br />vigorous, healthy condition is to be provided by Contractor and the irrigation system shall be <br />repaired immediately at no additional cost to the City. <br />At no time shall Contractor utilize a fire hydrant for irrigation purposes. <br />Contractor will keep system in operation by valve or head adjustment to keep all systems <br />operating at manufacturer's recommended operating pressure. This shall be accomplished by <br />valve throttling pressure gaging. The valves should be throttled to prevent sprinkler heads from <br />fogging, allowing droplets for effective watering. The City of Santa Ana may request a coverage <br />test to evaluate proper settings, timing, usage, or maintenance of system. <br />All valve boxes, controllers, and backflow devices shall be kept clear of plant growth. <br />Contractor shall be responsible for periodic inspection of surface drains located within the <br />landscaped areas. These drains shall be checked to assure proper functioning. Remove any <br />debris or vegetation that might accumulate at the inlet and prevent proper flow of water. <br />Any erosion damage because of Contractor's failure to keep the surface drains clear shall be <br />repaired at Contractor's expense. <br />Irrigation and drainage system repairs shall be compensated on a time and materials basis as <br />agreed to by the Contractor and the City. <br />1.7. GENERAL MAINTENANCE AND CLEAN-UP <br />The Contractor shall collect all clippings, trimmings, cuttings, rubbish and debris, and <br />posted signs at all work sites and dispose of same in a lawful manner per contract <br />requirements at the Contractor's expense. <br />All trash and debris shall be removed from all worksites a minimum of one (1) time per <br />week. <br />The Contractor shall rake, hand remove, or vacuum leaves that are not absorbed by <br />planting. This shall be done as often as required to maintain a neat appearance, or <br />prevent plants from being smothered by seasonal leaf drop at least weekly or as <br />directed by City of Santa Ana. <br />
The URL can be used to link to this page
Your browser does not support the video tag.