My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Construction Contract with Armstrong Cal Builders Inc. for the Santiago Park
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 15 - Construction Contract with Armstrong Cal Builders Inc. for the Santiago Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:06:31 AM
Creation date
9/11/2024 9:43:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT <br />NO.: 20-2731 <br />SANTIAGO PARK MAIN STREET ENTRANCE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />15 <br />Pedestrian Bridge at Ditch <br />I <br />LS <br />$ 2 u 3, �7-'tv <br />$ Z "jrb- <br />16 <br />Irrigation <br />1 <br />LS <br />$-JT-;S-Vo <br />$ �n-rS-Db <br />17 <br />Soil Preparation and Weed <br />52,7Q0 <br />SF <br />$ <br />D' �� <br />$ <br />Abatement <br />18 <br />Bioswale/Detention Basin <br />7,000 <br />SF <br />$2.1-ki�$ <br />19 <br />3" Layer of Mulch <br />16,400 <br />SF <br />$ 2.11 <br />$ i r 9r�* <br />20 <br />Dwarf Carpet of Stars Plants <br />29,500 <br />SF <br />$ -17 <br />$ q1,710.09 <br />21 <br />Box Tree — 84" <br />1 <br />EA <br />$ f . , jr" <br />$ i S"0 b <br />22 <br />Box Tree — 60" <br />2 <br />EA <br />$ 7-s-V <br />$ �'1 rv-P • <br />23 <br />Box Tree 36" <br />56 <br />EA <br />$ I, 31 Y. fir <br />$ <br />24 <br />Box Tree -- 24" <br />5 <br />EA <br />$ (,� ov. <br />25 <br />Tree — 15 gallon <br />46 <br />EA <br />$ 2117 . <br />$ 1, S"nb <br />26 <br />Shrub — 5 gallon <br />547 <br />EA <br />$ q3. 7-Jr <br />$ 21, 931 • 1 r <br />27 <br />Shrub — 1 gallon <br />754 <br />EA <br />$ <br />$ /yj 3� . <br />28 <br />90 day Post Installation <br />1 <br />LS <br />$ tr" <br />$ WD <br />Maintenance <br />29 <br />Site Furniture <br />I <br />LS <br />$ i'(� rl <br />$ <br />30 <br />Wayiinding Signs <br />6 <br />EA <br />$ �3 H' <br />$ .2It, Z t*O <br />31 <br />Electrical Service <br />I <br />LS <br />$ ro, U o <br />$ r0ro'eio v <br />32 <br />Electrical System — conduits, <br />I <br />LS <br />$ <br />$ 'k �j 't" <br />wiring, controls, etc. <br />33 <br />Light Poles -- foundations, poles. <br />23 <br />EA <br />$ 9 ?-.r O <br />$ 2a y 7-S.0 G <br />luminaries <br />34 <br />Remedial Grading <br />500 <br />CY <br />$ �Z'S�� <br />$ �11 Z t"D, <br />35 <br />Construction Permit <br />I <br />LS <br />$ 11,648.00 <br />$ 11,648.00 <br />W1] <br />P-2 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.