My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Construction Contract with Armstrong Cal Builders Inc. for the Santiago Park
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 15 - Construction Contract with Armstrong Cal Builders Inc. for the Santiago Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:06:31 AM
Creation date
9/11/2024 9:43:51 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 20-273 1 <br />SANTIAGO PARK MAIN STREET ENTRANCE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />36 SWPPP Risk Level N 1 LS <br />TOTAL BASE RID <br />$ �, q LSy $ � 9 r q ),9- <br />�� <br />$ <br />ALTERNATE l.:.,ehflkk <br />Aggiegate Base <br />44� <br />N <br />A i T RN A'i'9 F '-neh th0ek <br />Pe able f a eon d <br />�}`Ft3'd <br />SF <br />TI OTAL A Tr IN , Tr. nin <br />it n 1; -1 CW tW <br />The lowest responsible bidden shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 7-3.5 of the Standard Speci tications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly, <br />f This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications, <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES, <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within Two -Hundred and Ten (210) working days after the commencement date stated in <br />the Notice to Proceed. The first One -Hundred and Twenty (120) working days of which is for <br />construction, and the last Ninety (90) working days for the vandalisni-maintenance period. <br />The liquidated damages anzount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $3,130 per calendar day. <br />Name of Firth Armstronq Cal Builders Inc. <br />Signature of BIDDER <br />Title President/CEO <br />(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />H <br />W <br />P-3 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.