Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase ILIA — Civic Center Drive to Washington Avenue <br />4.0 REFERENCES <br />The following references were utilized for the preparation of this Addendum. <br />Applied Earthworks, Inc. 2015. Historic Property Survey Report --- Bristol Street Widening Project (Phase <br />1II) Civic Center Drive to Seventeenth Street. January 2015. <br />Basmaciyan-Darnell, hic. 1985. Intercity Liaison Committee — Five -Year Transportation Study Update to <br />1990. <br />California Department of Transportation (Caltrans). 2012. Noise Study Report — Bristol Street Widening <br />Phase III Civic Center Drive to Seventeenth Street, March 2012. <br />Mohle, Grover & Associates. 1983. Bristol Street Corridor Study -- Final Report, <br />Parsons, Brinekerhoff, Quade, and Douglas, .Inc. 1983. Arterial IIighway Element — Santa Ana Element — <br />Santa Ana Transportation Corridor State 11 Alternative Analysis. <br />POWER Engineers, Inc. 2015. Relocation Impact Statement Technical Memorandum — Bristol Street <br />Widening Project (Phase 111) Civic Center Drive to Seventeenth Street. January 2015. <br />RBF Consulting, 2014. Supplemental Technical Noise Study Memorandum — Bristol Street Widening <br />Project (Phase III) Civic Center Drive to Seventeenth Street, August 2014. <br />2015. Phase I Initial Site Assessment Update — Bristol Street Widening Project (Phase III) Civic <br />Center Drive to Seventeenth Street. January 2015. <br />Santa Ana, City of. 2010. City of Santa Ana General Plan. Adopted September 1982 (with updates and <br />reformatting through January 2010). <br />2013. City of Santa Ana Website: www.ci.santa-ana.ca.us. Accessed November 2013. <br />2013b. 17" St. at Bristol St. EB Right Turn Pocket Future LOS Calculation Memorandum. <br />November 25, 2013. <br />Southern California Association of Governments (SCAG). 2008. Orange County RTIP, Project fisting <br />Report. Accessed at: www.scag.oa.gov, <br />URS Corporation. 2010a. Traffic Impact Analysis — Bristol Street Widening Project Phase III Civic <br />Center Drive to Seventeenth Street. September 2010. <br />2010b, Community Impact Assessment — Bristol Street Widening Project Civic Center Drive to <br />Seventeenth Street (Phase III). October 2010. <br />2011a. Natural Environment Study (Minimal Impacts) — Bristol Street Widening Project Civic <br />Center Drive to Seventeenth Street (Phase III). April 2011. <br />201 lb. Final Relocation Impact Statement — Bristol Street Widening Project Civic Center Drive to <br />Seventeenth Street (Phase III). November 2011. <br />2012a. Historic Resources Evaluation Report — Bristol Street Widening Project Civic Center Drive <br />to Seventeenth Street (Phase III). September 2012. <br />ANA 305-011 (PER 02) CITY OF SANTA ANA (01/19/2015) YU PAGE 57 <br />