My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:08:27 AM
Creation date
9/11/2024 9:43:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase ILIA — Civic Center Drive to Washington Avenue <br />4.0 REFERENCES <br />The following references were utilized for the preparation of this Addendum. <br />Applied Earthworks, Inc. 2015. Historic Property Survey Report --- Bristol Street Widening Project (Phase <br />1II) Civic Center Drive to Seventeenth Street. January 2015. <br />Basmaciyan-Darnell, hic. 1985. Intercity Liaison Committee — Five -Year Transportation Study Update to <br />1990. <br />California Department of Transportation (Caltrans). 2012. Noise Study Report — Bristol Street Widening <br />Phase III Civic Center Drive to Seventeenth Street, March 2012. <br />Mohle, Grover & Associates. 1983. Bristol Street Corridor Study -- Final Report, <br />Parsons, Brinekerhoff, Quade, and Douglas, .Inc. 1983. Arterial IIighway Element — Santa Ana Element — <br />Santa Ana Transportation Corridor State 11 Alternative Analysis. <br />POWER Engineers, Inc. 2015. Relocation Impact Statement Technical Memorandum — Bristol Street <br />Widening Project (Phase 111) Civic Center Drive to Seventeenth Street. January 2015. <br />RBF Consulting, 2014. Supplemental Technical Noise Study Memorandum — Bristol Street Widening <br />Project (Phase III) Civic Center Drive to Seventeenth Street, August 2014. <br />2015. Phase I Initial Site Assessment Update — Bristol Street Widening Project (Phase III) Civic <br />Center Drive to Seventeenth Street. January 2015. <br />Santa Ana, City of. 2010. City of Santa Ana General Plan. Adopted September 1982 (with updates and <br />reformatting through January 2010). <br />2013. City of Santa Ana Website: www.ci.santa-ana.ca.us. Accessed November 2013. <br />2013b. 17" St. at Bristol St. EB Right Turn Pocket Future LOS Calculation Memorandum. <br />November 25, 2013. <br />Southern California Association of Governments (SCAG). 2008. Orange County RTIP, Project fisting <br />Report. Accessed at: www.scag.oa.gov, <br />URS Corporation. 2010a. Traffic Impact Analysis — Bristol Street Widening Project Phase III Civic <br />Center Drive to Seventeenth Street. September 2010. <br />2010b, Community Impact Assessment — Bristol Street Widening Project Civic Center Drive to <br />Seventeenth Street (Phase III). October 2010. <br />2011a. Natural Environment Study (Minimal Impacts) — Bristol Street Widening Project Civic <br />Center Drive to Seventeenth Street (Phase III). April 2011. <br />201 lb. Final Relocation Impact Statement — Bristol Street Widening Project Civic Center Drive to <br />Seventeenth Street (Phase III). November 2011. <br />2012a. Historic Resources Evaluation Report — Bristol Street Widening Project Civic Center Drive <br />to Seventeenth Street (Phase III). September 2012. <br />ANA 305-011 (PER 02) CITY OF SANTA ANA (01/19/2015) YU PAGE 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.