My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:08:27 AM
Creation date
9/11/2024 9:43:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase I11A — Civic Center Drive to Washington Avenue <br />1.0 INTRODUCTION <br />This Addendum has been prepared in accordance with the California Environmental Quality Act (CEQA), <br />as amended, to evaluate the potential environmental impacts of the proposed changes to the widening of <br />Bristol Street, from Warner Avenue to Memory Lane as proposed in the Project Final Environmental <br />Impact Statement I Environmental Impact Report (FEISIEIR) approved in 1990 (FHWA-CA-EI S - 8 9-0 1 - <br />F; SCH No. 87071509). <br />This Addendum focuses on the segment of Bristol Street between Civic Center Drive to Washington <br />Avenue (Phase IIIA, or Project) and .is limited to the proposed improvements to this segment. This <br />Addendum provides an assessment of potential environmental impacts associated with minor design <br />modifications and the issue of climate change which was not addressed in the previously prepared and <br />certified FEISIEIR. <br />Design modifications to the Project, since approval of the 1990 FEISIEIR, that are addressed in this <br />Addendum include the following: <br />6 The 1990 FEISIEIR, using decommissioned noise methodology, recommended noise barriers <br />(soundwalls) at all easterly parcel boundaries currently fronting the east side of Bristol Street <br />between Civic Center Drive and Washington Avenue. However, using current noise modeling <br />methodology (RBF Consulting 2014), noise abatement in the form of noise barriers is not <br />required for the Phase IIIA Project. <br />• For purposes of aesthetic treatment and enhancement, the proposed Project would install an <br />approximately 8-foot high block wall at approximately the same location where soundwalls were <br />previously recommended (as addressed in the 1990 FEISIEIR). <br />• The proposed Project increases the total right-of-way width from 120 feet to 128 feet. The <br />proposed Project right-of-way cross-section would maintain a curb -to -curb width of 100 feet, <br />would accommodate a 7-foot wide bike lane on each side of the roadway, and would not affect <br />the number or width of vehicular travel lanes as compared to the right-of-way cross-section <br />addressed in the 1990 FEISIEIR. However, the proposed Project right-of-way cross section, as <br />compared to the right-of-way cross section addressed in the 1990 FEISIEIR, would reduce the <br />width of the sidewalks from 10 to 8 feet and also accommodate a 6-foot wide parkway on each <br />side of Bristol Street to separate pedestrian and vehicular travel; a parkway was not included as <br />part of the roadway cross section addressed in the 1990 FEISIEIR. Acquisition of property <br />resulting from the proposed Project right-of-way is accounted for in this analysis. <br />• Addition of a westbound right -turn lane on Washington Avenue at Bristol Street. <br />• Addition of a cul-de-sac at 9th Street on the west side of Bristol Street. <br />• Full and partial acquisition on both sides of Bristol Street between Civic Center Drive and <br />Washington Avenue. <br />• Changes in land use as part of the Bristol Specific Plan Addendum, as follows: <br />o Assessor Parcel Numbers (AP -Ns) 405-262-21, -22, -23, -24, -25, -26, -27, -28, -29, -30, - <br />31, -32, and -33; and 405-274-09, -10, -11, -12, and -13) Land use change from Park to <br />Park with Commercial option, <br />Additionally, the topic of greenhouse gas (GHG) emissions was not addressed in the previously approved <br />1990 FEISIEIR as this topic was not a subject matter that required evaluation pursuant to CEQA at that <br />time. As such, this Addendum analyzes the effects of GHG emissions associated with construction and <br />operation of the proposed Project. <br />ANA 305-011 (PER 02) CITY OF SANTA ANA (01/19/2015) YU PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.