Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase 111A — Civic Center Drive to Washington Avenue <br />Mitigation Measures <br />No mitigation measures are required. <br />3.8 Hazards and Hazardous Materials <br />This section corresponds with Section IV - Environmental Consequences and Mitigation Measures, <br />Subsections V - Construction Impacts, X - Hazardous Materials, of the 1990 Final EIS/EIR. <br />a.) Create a significant hazard to the public or the environment through the routine transport, use, <br />or disposal of hazardous materials? <br />The proposed Project would involve demolition of existing structures. Compliance with the standard <br />protocol surveys and abating procedures would be required prior to any demolition activities that would <br />potentially disturb existing building materials. Furthermore, specific requirements limiting asbestos <br />emissions from building demolition activities are set forth in SCAQMD Rule 1403 (Asbestos Emission <br />from Demolition/Renovation Activities). The existing structures to be demolished and roadway pavement <br />striping are also required to be surveyed for lead -based paint prior to removal, in compliance with the <br />applicable local, state, and federal regulations administered through the California Division of <br />Occupational Safety and Health. Compliance with existing regulations would ensure that impacts are not <br />greater than previously analyzed in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No mitigation measures are required. <br />b.) Create a significant hazard to the public or the environment through reasonably foreseeable <br />upset and accident conditions involving the release of hazardous materials into the environment? <br />Refer to response in 3.8 (a.), above. Compliance with existing regulations and mitigation measures from <br />the 1990 FEIS/EIR would ensure that impacts are not greater than previously analyzed. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />c.) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or <br />waste within one -quarter mile of an existing or proposed school? <br />As listed below in Table 7, there are four schools located within approximately one -quarter mile of the <br />Project site. <br />TABLE 7 SCHOOLS WITHIN THE PHASE ILIA PROJECT AREA <br />SCHOOL NAME <br />ADDRESS ' <br />DISTANCE <br />'LOGATION <br />Gonzalo Felicitas Mendez Fundamental 2000 North Bristol Street <br />0.17 mile <br />Northwest of Bristol Street at 17th <br />Intermediate School <br />Santa Ana, CA 92706 <br />Street intersection <br />Love 2 Learn Preschool & K <br />1200 West 17th Street <br />0.10 mile <br />East of Bristol Street at 17th Street <br />Santa Ana, CA 92706 <br />intersection <br />Woodrow Wilson Elementary School <br />1317 North Baker Street <br />0.16 mile <br />Northeast of Bristol Street at <br />Santa Ana, CA 92706 <br />Washington Avenue intersection <br />Heroes Elementary School <br />1111 W Civic Center Drive <br />0.25 miles <br />East of Bristol Street at Civic <br />Santa Ana, CA 92703 <br />Center Drive intersection <br />ANA 305-0I1 (PER 02) CITY OF SANTA ANA (01/19/2015) YU PAGE 41 <br />