My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:08:27 AM
Creation date
9/11/2024 9:43:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase qIA — Civic Center Drive to Washington Avenue <br />g.) Place housing within a I00 year flood hazard area as mapped on a federal Flood Hazard <br />Boundary or Flood Insurance Rate Map or otherflood load hazard delineation map? <br />The proposed widening would not place any housing within a 100-year flooding zone as mapped by the <br />Federal Emergency Management Agency; therefore, no impact would result from the proposed Project in <br />that regard. Impacts would be similar to those identified in the 1990 FEISIEIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />h.) Place within a 100 year flood hazard area structures which would impede or redirect flood <br />flows? <br />Refer to response in 3.9 (g), above. Impacts would be similar to those identified in the 1990 FEISIEIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />i.) Expose people or structures to a significant risk of loss, injury or death involving flooding, <br />including flooding as a result of the failure of a levee or dam? <br />The proposed Project does not involve the development or placement of any structures, with exception of <br />relocation of utility poles. Therefore, the Project would not expose people or structures to a significant <br />flooding risk beyond that which already exists. No impact would result from the proposed Project. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />j.) Inundation by seiche, tsunami, or mudflow? <br />The Project site is located approximately 10 miles inland from the Pacific Ocean; therefore, the likelihood <br />of tsunami impacting the site is minimal. The Project site and vicinity are highly urbanized and there is no <br />unusual slope or geologic features in the area. The potential for seiche, tsunami, or mudflow impacting <br />the Project site is less than significant. Impacts would be similar to those identified in the 1990 FEISIEIR. <br />Mitigation Measure <br />No new additional mitigation measures are required. <br />3.10 Land Use and Planning <br />This section corresponds with Section IV - Environmental Consequences and Mitigation Measures, <br />Subsection A - Landform Modification, of the 1990 FEISIEIR. <br />a.) Physically divide an established community? <br />The proposed Project involves the widening of Bristol Street between Civic Center Drive and Washington <br />Avenue; the proposed widening would not divide an established community. Although the proposed <br />widening of Bristol Street within the Project limits would result in full acquisition of existing properties, <br />ANA 305-011 (PER 02) C17Y OF SANTA ANA (01/19/2015) YU PAGE 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.