My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 16 - Construction Contract with Los Angeles Engineering, Inc. for the Bristol Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:08:27 AM
Creation date
9/11/2024 9:43:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase 111A -- Civic Center Drive to Washington Avenue <br />3.14 Public Services <br />This section corresponds with Section IV - Environmental Consequences and Mitigation Measures, <br />Subsections P - Impacts on Community Facilities, and V - Construction Impacts of the 1990 FFIS/EIR. <br />a.) Fire Protection? <br />The proposed Project includes the widening of the existing Bristol Street and no increase in demand for <br />fire protection services would occur with implementation of the proposed Project. Furthermore, the <br />proposed Project would result in positive impacts as a result of greater congestion relief and increased <br />mobility in the vicinity for motor vehicles including emergency vehicles. Impacts would be similar to <br />those identified in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />b.) Police Protection? <br />Refer to response for Section 3.14 (a.), above. The proposed Project would reduce congestion and traffic <br />idling times, and therefore, increase mobility of emergency vehicles, including police vehicles. The <br />proposed Project would not result in the need or increase the demand for police services in the area. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />c.) Schools? <br />No schools would be impacted by the proposed Project and no school services would be affected by the <br />proposed Project (see response to Section 3.8 (c.), above, for information regarding schools in the vicinity <br />of the Project). Impacts would be similar to those identified in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />d.) Parks? <br />There are no parks within the Project limits, and no park services would be increased or impacted as a <br />result of the proposed Project. Impacts would be similar to those identified in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />e.) Other public facilities? <br />The proposed Project entails the widening of Bristol Street between Civic Center Drive and Washington <br />Avenue, and would not generate demands for public facilities. hnpacts would be similar to those <br />identified in the 1990 FEIS/EIR. <br />ANA 305-011 (PER 02) CITY OF SANTA ANA (01119/2015) YU PAGE 51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.