My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Construction Contract with Vido Samarzich, Inc. for the Standard Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 18 - Construction Contract with Vido Samarzich, Inc. for the Standard Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:11:14 AM
Creation date
9/11/2024 9:44:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />CITY OF SANTA ANA REBID <br />PROPOSAL <br />PROJECT NO. 20-6965, ATP 5063(196) - STANDARD AVE BIKEWAY FROM WARNER AVE TO 2ND ST <br />PROJECT NO. 20-6962, ATP 5063(198) -MCFADDEN AVE BIKEWAY FROM HARBOR BLVD TO GRAND AVE <br />PROJECT NO.23-6707 - STANDARD AVE PAVEMENT REHABILITATION FROM WARNER AVE TO 2ND ST <br />PROJECT NO.23-6705 - MCFADDEN AVE; PAVFN4 F;NI' REHABILITA110N FROM HARBOR BLVD TO FAIRVIEW ST <br />PROJECT NO. 19-6923 - MCFADDEN AVE PAVEMENT REHABILITATION FROM FAIRVIEW ST TO RAITT ST <br />PROJECT NO. 23-6706 - MCFADDEN AVE PAVEMENT REHABILITATION FROM RAITT ST TO GRAND AVE <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Vido Samarzich, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />BASE BID: <br />20-6965, ATP 5063(196) — STANDARD AVE BIKEWAY FROM WARNER AVE TO 2ND ST <br />20-6962, ATP 5063(198) — MCFADDEN AVE BIKEWAY FROM HARBOR BLVD TO GRAND AVE <br />19-6923 — MCFADDEN AVE PAVEMENT REHABILITATION FROM FAIRVIEW ST TO RAITT ST <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />STORM WATER POLLUTION <br />1 <br />LS <br />$ <br />$ <br />PREVENTION PLAN (SWPPP) - <br />RISK LEVEL 2 <br />600,000.00 <br />600,000.00 <br />2 <br />UNCLASSIFIED EXCAVATION* <br />6,173 <br />C'Y <br />S <br />S <br />200.00 <br />1,234,600.00 <br />3 <br />REMOVE EXISTING TREE <br />2 <br />EA <br />S <br />S <br />3,000.00 <br />6,000.00 <br />4 <br />COLD PLANE EXISTING <br />299,410 <br />SF <br />$ <br />S <br />ASPHALT CONCRETE <br />PAVEMENT 2" MAX)0.66 <br />197,610.60 <br />5 <br />CONSTRUCT ASPHALT <br />4,212 <br />TON <br />$ <br />$ <br />RUBBER HOT MIX (THICKNESS <br />PER PLAN)* <br />200.00 <br />842,400.00 <br />6 <br />CONSTRUCT ASPHALT <br />3,100 <br />TON <br />$ <br />$ <br />CONCRETE PAVEMENT* <br />240.00 <br />744,000.00 <br />7 <br />CONSTRUCT AGGREGATE <br />370 <br />TON <br />$ <br />$ <br />BASE* <br />100.00 <br />37,000.00 <br />8 <br />CONSTRUCT MODIFIED <br />8,570 <br />LF <br />$ <br />$ <br />CONCRETE CURB AND <br />80.00 <br />685,600.00 <br />GUTTER TYPE A-2-8 PER C.S.A. <br />STD PLAN NO. 1101 WITH 1' <br />GUTTER PLATE PAN <br />9 <br />CONSTRUCT CONCRETE CURB <br />2,450 <br />LF <br />S <br />$ <br />AND GUTTER TYPE A-2-8 PER <br />80.00 <br />196,000.00 <br />C.S.A. STD PLAN NO. 1101 <br />P-1 of P-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.