My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Construction Contract with Vido Samarzich, Inc. for the Standard Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 18 - Construction Contract with Vido Samarzich, Inc. for the Standard Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:11:14 AM
Creation date
9/11/2024 9:44:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA REBID <br />PROPOSAL <br />PROJECT NO.20-6965, ATP 5063(196) - STANDARD AVE BIKEWAY FROM WARNER AVE TO 2ND ST <br />PROJECT NO. 20-6962, ATP 5063(198) MCFADDEN AVE BIKEWAY FROM HARBOR BLVD TO GRAND AVE <br />PROJECT NO.23-6707 - STANDARD AVE PAVEMENT REHABILITATION FROM WARNER AVE TO 2ND ST <br />PROJECT NO.23-6705 - MCFADDEN AVE PAVFNEN'I' REHABILI'I'A'I'ION FROM HARBOR BI..VD TO FAIRVIEW ST <br />PROJECT NO. 19-6923 - MCFADDEN AVE PAVEMENT REHABILITATION FROM FAIRVIEW ST TO RAITT ST <br />PROJECT NO. 23-6706 - MCFADDEN AVE PAVEMENT REHABILITATION FROM RAITT ST TO GRAND AVE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />10 <br />CONSTRUCT CONCRETE CURB <br />300 <br />LF <br />$ <br />S <br />TYPE AI-6PER CALTRANS <br />80.00 <br />24,000.00 <br />STD. PLAN A87A <br />11 <br />CONSTRUCT CONCRETE CURB <br />1,324 <br />LF <br />$ <br />S <br />AND GUTTER TYPE A-2-6 PER <br />C.S.A. STD PLAN NO. 1101 <br />80.00 <br />105,920.00 <br />12 <br />CONSTRUCT CONCRETE CURB <br />9,400 <br />LF <br />$ <br />S <br />AND GUTTER TYPE A-2-6 PER <br />C.S.A. STD PLAN NO. 1101 (12" <br />80.00 <br />752,000.00 <br />GUTTER PAN) <br />13 <br />CONSTRUCT CONCRETE CURB <br />2,178 <br />LF <br />$ <br />S <br />AND GUTTER TYPE B-1 <br />80.00 <br />174,240.00 <br />14 <br />CONSTRUCT CONCRETE CURB <br />530 <br />LF <br />$ <br />S <br />TYPE B1-6 PER CALTRANS STD <br />PLAN A87A <br />80.00 <br />42,400.00 <br />15 <br />STAMPED CONCRETE <br />6,500 <br />SF <br />$ <br />S <br />30.00 <br />195, 000.00 <br />16 <br />RETAINING CURB <br />235 <br />LF <br />$ <br />S <br />50.00 <br />11,750.00 <br />17 <br />CONSTRUCT CONCRETE BUS <br />11,170 <br />SF <br />$ <br />PAD PER C.S.A. STD PLAN? NO. <br />1108 <br />30.00 <br />335,100.00 <br />18 <br />CONSTRUCT 6" MONOLITHIC <br />26,990 <br />SF <br />$ <br />$ <br />PCC BIKE LANE PER DETAIL <br />WITH DOWELS <br />25.00 <br />674,750.00 <br />19 <br />CONSTRUCT 8" MONOLITHIC <br />6,260 <br />SF <br />$ <br />S <br />PCC BIKE LANE OVER <br />COMPACTED SUBGRADE <br />40.00 <br />250,400.00 <br />WITH SCORE JOINTS AT 10' <br />INTERVAL. DOWELED AND <br />BONDED TO EXISTING <br />SIDEWALK AND DRIVEWAY <br />APPROACH AT 24" INTERVALS <br />20 <br />CONSTRUCT 8" MONOLITHIC <br />3,250 <br />SF <br />$ <br />S <br />PCC BIKE LANE AND 8" CURB <br />OVER COMPACTED <br />45.00 <br />146,250.00 <br />SUBGRADE PER DETAIL "C" <br />ON SHEET DSO WITH SCORE <br />JOINTS AT 10' 1NTERVALS. <br />21 <br />CONSTRUCT CURB RAMPS <br />10,122 <br />SF <br />$ <br />S <br />TYPESPERPLANS* <br />35.00 <br />354,270.00 <br />22 <br />CONSTRUCT ALLEY APRON <br />392 <br />SF <br />$ <br />S <br />PER C.S.A. STD PLAN 1 111 AND <br />DETAILS AS SHOWN ON <br />30.00 <br />11,760.00 <br />CONSTRUCTION DETAIL <br />SHEETS. <br />P-2 of P-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.