My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Construction Contract with Vido Samarzich, Inc. for the Standard Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 18 - Construction Contract with Vido Samarzich, Inc. for the Standard Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:11:14 AM
Creation date
9/11/2024 9:44:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA REBID <br />PROPOSAL <br />PROJECT NO. 20-6965, ATP 5063(196) - STANDARD AVE BIKEWAY FROM WARNER AVE TO 2ND ST <br />PROJECT NO.20-6962, ATP 5063(198) MCFADDEN AVE BIKEWAY FROM HARBOR BLVD TO GRAND AVE <br />PROJECT NO.23-6707 - STANDARD AVE PAVEMENT REHABILITATION FROM WARNER AVE TO 2ND ST <br />PROJECT NO.23-6705 - MCFADDEN AVE PAVEMENT REHABILI'IA'I'ION FROM HARBOR BLVD TO FAIRVIEW ST <br />PROJECT NO. 19-6923 - MCFADDEN AVE PAVEMENT REHABILITATION FROM FAIRVIEW ST TO RAITT ST <br />PROTECT NO.23-6706 - MCFADDF,N AVE PAVEMENT REHABILITATION FROM RAITT ST TO GRAND AVE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />86 <br />TRAFFIC SIGNAL <br />- 1 <br />LS <br />$ <br />MODIFICATION — MCFADDEN <br />103, 000.00 <br />103, 000.00 <br />AVE & RAITT STREET <br />87 <br />TRAFFIC SIGNAL <br />I <br />LS <br />$ <br />S <br />MODIFICATION—MCFADDEN <br />65,000.00 <br />65,000.00 <br />AVE & PACIFIC AVE <br />88 <br />TRAFFIC SIGNAL <br />] <br />LS <br />S <br />S <br />MODIFICATION—MCFADDEN <br />26,500.00 <br />26,500.00 <br />AVE & BRISTOL STREET <br />89 <br />TRAFFIC SIGNAL <br />1 <br />LS <br />S <br />S <br />MODIFICATION — MCFADDEN <br />AVE & SHELTON STREET <br />291, 000.00 <br />291, 000.00 <br />90 <br />TRAFFIC SIGNAL <br />1 <br />LS <br />S <br />S <br />MODIFICATION — MCFADDEN <br />15,000.00 <br />15,000.00 <br />AVE & FLOWER STREET <br />91 <br />TRAFFIC SIGNAL <br />1 <br />LS <br />$ <br />S <br />MODIFICATION — MCFADDEN <br />AVE & BROADWAY STREET <br />LS <br />147, 000.00 <br />$ <br />147, 000.00 <br />S <br />92 <br />TRAFFIC SIGNAL <br />1 <br />MODIFICATION—MCFADDEN <br />76,500.00 <br />76,500.00 <br />AVE & MAIN STREET <br />93 <br />TRAFFIC SIGNAL <br />l <br />LS <br />S <br />S <br />MODIFICATION — MCFADDEN <br />174,000.00 <br />174, 000.00 <br />AVE & ORANGE AVE <br />94 <br />TRAFFIC SIGNAL <br />1 <br />LS <br />$ <br />$ <br />MODIFICATION — MCFADDEN <br />AVE & MAPLE STREET <br />127, 500.00 <br />127, 500.00 <br />95 <br />TRAFFIC SIGNAL <br />I <br />I'S <br />S <br />S <br />MODIFICATION—MCFADDEN <br />AVE & HATHAWAY STREET <br />77,000.00 <br />77,000.00 <br />96 <br />TRAFFIC SIGNAL <br />1 <br />LS <br />S <br />$ <br />MODIFICATION—MCFADDEN <br />78,500.00 <br />78,500.00 <br />AVE & GRAND AVE <br />97 <br />MODIFYING RRFB SYSTEM <br />1 <br />LS <br />S <br />S <br />(OAK ST MIDBLOCK <br />4,200.00 <br />4,200.00 <br />CROSSING <br />98 <br />FURNISH AND INSTALL <br />73 <br />EA <br />$ <br />$ <br />TRAFFIC LOOPS <br />590.00 <br />43,070.00 <br />99 <br />INSTALL NO. 6 PULLBOX <br />164 <br />EA <br />S <br />$ <br />1,050.00 <br />172,200.00 <br />100 <br />INSTALL NO.6E PULLBOX <br />22 <br />EA <br />$ <br />$ <br />1,300.00 <br />28,600.00 <br />101 <br />INSTALL 3" PVC CONDUIT <br />9.530 <br />LF <br />S <br />$ <br />98.50 <br />938,705.00 <br />102 <br />INSTALL 4" PVC CONDUIT <br />1,717 <br />LF <br />V186.00 <br />319,362.00 <br />P-7 of P-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.