Laserfiche WebLink
CITY OF SANTA ANA REBID <br />PROPOSAL ADDENDUM NO.2 <br />PROJECT NO.20-6965, ATP 5063(196) — STANDARD AVE BIKEWAY FROM WARNER AVE TO 2ND ST <br />PROJECT NO.20-6962, ATP 5063(198) - MCFADDEN AVE BIKEWAY FROM HARBOR BLVD TO GRAND AVE <br />PROJECT NO.23-6707 - STANDARD AVE PAVEMENT REHABILITATION FROM WARNER AVE TO 2N° ST <br />PROJECT NO, 23-6705 - MCFADDEN AVE PAVEMENT REHABILITATION FROM HARBOR BLVD TO FAIRVIEW ST <br />PROJECT NO. 19-6923 - MCFADDEN AVE PAVEMENT REHABILITATION FROM FAIRVIEW ST TO RAITT ST <br />PROJECT NO.23-6706 - MCFADDEN AVE PAVEMENT REHABILITATION FROM RAITT ST TO GRAND AVE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />103 <br />INSTALL IP COMMUNICATION <br />1 <br />LS <br />$ <br />$ <br />SYSTEMS <br />102,000.00 <br />102,000.00 <br />104 <br />INSTALL 120 STRAND SIGNAL <br />2,142 <br />LF <br />$ <br />$ <br />MODE FIBER OPTIC (SMFO) <br />CABLE <br />3.40 <br />7,282.80 <br />105 <br />INSTALL 12 STRAND SIGNAL <br />2,280 <br />LF <br />$ <br />$ <br />MODE FIBER OPTIC (SMFO) <br />5.60 <br />12,768.00 <br />CABLE <br />106 <br />INSTALL 24 STRAND SIGNAL <br />20,000 <br />LF <br />$ <br />$ <br />MODE FIBER OPTIC (SMFO) <br />CABLE45,000.00 <br />2.25 <br />107 <br />FUSION SPLICE 1 STRAND OF <br />36 <br />EA <br />$ <br />$ <br />SINGLE MODE FIBER OPTIC <br />SMFO <br />358.00 <br />12,888.00 <br />108 <br />INSTALL FIBER OPTIC SPLICE <br />22 <br />EA <br />$ <br />$ <br />CLOSURE <br />4,500.00 <br />99,000.00 <br />109 <br />POTHOLE TRAFFIC SIGNAL <br />72 <br />EA <br />$ <br />$ <br />POLE LOCATION FOR UTILITY <br />1,680.00 <br />120, 960.00 <br />CONFLICT <br />110 <br />RAILROAD: UPRR PERMIT <br />1 <br />LS <br />4 <br />$ <br />60,000.00 <br />60,000.00 <br />Ill <br />RAILROAD: UPRR FLAGGING <br />30** <br />DAY <br />$1,500 <br />$45,000 <br />112 <br />LANDSCAPE <br />1 <br />LS <br />$ <br />$ <br />300,000.00 <br />300,000.00 <br />113 <br />IRRIGATION <br />1 <br />LS <br />$ <br />$ <br />650,000.00 <br />650,000.00 <br />114 <br />120-DAY PLANT <br />1 <br />LS <br />$ <br />$ <br />ESTABLISHMENT <br />10,000.00 <br />10,000.00 <br />115 <br />CONSTRUCTION PERMIT <br />1 <br />LS <br />$42,319 <br />$42,319 <br />116 <br />PROJECT ADVERTISEMENT <br />3 <br />EA <br />$ <br />$ <br />SIGN <br />2,000.00 <br />6,000.00 <br />1.17 <br />CONSTRUCT 8" GATE VALVE <br />1 <br />LS <br />$ <br />S <br />PER C.S.A. STD PLAN NO. 1410. <br />REPLACE 25'WATER MAIN <br />35,000.00 <br />35,000.00 <br />BETWEEN OLD AND NEW <br />VALVE LOCATION WITH PVC <br />PIPE. CONNECT TO EXISTING <br />PIPE PER C.S.A STD PLAN NO. <br />1409 <br />118 <br />CONSTRUCT 12" GATE VALVE <br />1 <br />LS <br />$ <br />C.S.A. STD PLAN NO. 1410. <br />REPLACE 50' WATER MAIN <br />45,000.00 <br />45,000.00 <br />BETWEEN OLD AND NEW <br />P-8 of P-30 <br />