My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Construction Contract with Vido Samarzich, Inc. for the Standard Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 18 - Construction Contract with Vido Samarzich, Inc. for the Standard Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:11:14 AM
Creation date
9/11/2024 9:44:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA REBID <br />PROPOSAL <br />PROJECT NO. 20-6965, ATP 5063(196) - STANDARD AVE BIKEWAY FROM WARNER AVE TO 2ND ST <br />PROJECT NO.20-6962, ATP 5063(198) -MCFADDEN AVE BIKEWAY FROM HARBOR BLVD TO GRAND AVE <br />PROJECT NO.23-6707 - STANDARD AVE PAVEMENT REHABILITATION FROM WARNER AVE TO 2NI) ST <br />PROJECTNO. 23-6705 - MCFADDEN AVE, PAVEMFNT RI-NABILITAf10N FROM HARBOR BLVD TO FAIRVIEW ST <br />PROJECT NO. 19-6923 - MCFADDEN AVE PAVEMENT REHABILITATION FROM FAIRVIEW ST TO RAITT ST <br />PROJECT NO. 23-6706 - MCFADDEN AVE PAVEMENT REHABILITATION FROM RATTT ST TO GRAND AVE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />7 <br />CONSTRUCTION PERMIT <br />I <br />LS <br />$15,000 <br />$15,000 <br />8 <br />PROJECT ADVERTISEMENT <br />SIGN <br />I <br />EA <br />$ <br />2,200.00 <br />$ <br />2,200.00 <br />TOTAL ADD ALTERNATE NO. 1 BID <br />S 2,104,400.00 <br />ADD ALTERNATE NO.2 <br />23-6705 MCFADDEN AVE. PAVEMENT REHABILITATION FROM HARBOR BLVD TO FAIRVIEW ST. <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />UNCLASSIFIED EXCAVATION* <br />480 <br />CY <br />$ <br />181.50 <br />87,120.00 <br />2 <br />COLD PLANE EXISTING <br />141,700 <br />SF <br />$ <br />S <br />ASPHALT CONCRETE <br />PAVEMENT (2" MAX) <br />0.78 <br />110,526.00 <br />3 <br />COLD PLANE EXISTING <br />67,600 <br />SF <br />$ <br />S <br />ASPHALT CONCRETE <br />PAVEMENT (> 2") <br />2.20 <br />148,720.00 <br />4 <br />CONSTRUCT ASPHALT <br />1800 <br />TON <br />$ <br />S <br />RUBBER HOT MIX (THICKNESS <br />210.00 <br />588,000.00 <br />PER PLAN) * <br />5 <br />CONSTRUCT ASPHALT <br />1,540 <br />TON <br />$ <br />S <br />CONCRETE PAVEMENT* <br />240.00 <br />369,600.00 <br />6 <br />CONSTRUCT CONCRETE CURB <br />200 <br />LF <br />$ <br />S <br />AND GUTTER TYPE A-2-8 PER <br />77.00 <br />15,400.00 <br />C.S.A. STD PLAN NO. 1101 <br />7 <br />CONSTRUCT CONCRETE BUS <br />900 <br />SF <br />$ <br />PAD PER C.S.A. STD PLAN NO. <br />27.50 <br />24,750.00 <br />1108 <br />8 <br />CONSTRUCT 4" THICK <br />800 <br />SF <br />$ <br />SIDEWALK PER C.S.A. STD <br />16.50 <br />13,200.00 <br />PLAN 1104 <br />9 <br />ADJUST SEWER MANHOLE <br />4 <br />EA <br />$ <br />FRAME AND GRATE TO FINISH <br />GRADE PER C.S.A. STD PLAN <br />1,430.00 <br />5,720.00 <br />1201 <br />10 <br />FURNISH AND INSTALL NEW <br />15 <br />EA <br />$ <br />S <br />WATER VALVE FRAME AND <br />1,870.00 <br />28,050.00 <br />COVER TO FINISHED GRADE <br />P-10 of P-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.