Laserfiche WebLink
CITY OF SANTA ANA REBID <br />PROPOSAL <br />PROJECT NO. 20-6965, ATP 5063(196) - STANDARD AVE BIKEWAY FROM WARNER AVE TO 2ND ST <br />PROJECT NO.20-6962, ATP 5063(198) MCFADDEN AVE BIKEWAY FROM HARBOR BLVD TO GRAND AVE <br />PROJECT NO.23-6707 - STANDARD AVE PAVEMENT REHABILITATION FROM WARNER AVE TO 2ND ST <br />PROJECTNO.23-6705 - MCFADDEN AVE PAVEMF.N'I' RERABILiI'A'1'lON FROM HARBOR BLVD TO FAIRVIEW ST <br />PROJECT NO. 19-6923 - MCFADDEN AVE PAVEMENT REHABILITATION FROM FAIRVIEW ST TO RAITT ST <br />PROJECT NO. 23-6706 -MCFADDEN AVE PAVEMENT REHABILITATION FROM RAITT ST TO GRAND AVE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />VALVE LOCATION WITH PVC <br />PIPE. CONNECT TO EXISTING <br />PIPE PER C.S.A STD PLAN NO. <br />1409 <br />119 <br />ABANDON EXISTING GATE <br />I <br />LS <br />S <br />S <br />VALVE. REMOVE VALVE BOX <br />3,500.00 <br />3,500.00 <br />FRAME AND COVER. CUT OFF <br />RISER 18" BELOW GRADE. <br />BACKFILL WITH SAND, <br />COMPACT AND REPAVE <br />120 <br />REMOVE AND DISPOSE <br />1 <br />LS <br />$ <br />S <br />EXISTING GATE VALVE <br />9,000.00 <br />9,000.00 <br />121 <br />CONSTRUCT 6" ROLLED CURB <br />64 <br />LF <br />$ <br />PER DETAIL ON SHEET DD-26 <br />120.00 <br />7,680.00 <br />TOTAL BASE BID <br />$ 17,812,716.40 <br />ADD ALTERNATE NO. 1 <br />23-6707 STANDARD AVE. PAVEMENT REHABILITATION FROM WARNER AVE. TO 2ND ST. <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />COLD PLANE EXISTING <br />407,400 <br />SF <br />$ <br />$ <br />ASPHALT CONCRETE <br />0.70 <br />285,180.00 <br />PAVEMENT (2" MAX) <br />2 <br />CONSTRUCT ASPHALT <br />5,610 <br />TON <br />$ <br />RUBBER HOT MIX (THICKNESS <br />215.00 <br />1,206,150.00 <br />PER PLAN) * <br />3 <br />ADJUST WATER VALVE <br />25 <br />EA <br />S <br />ti <br />FRAME AND COVER TO FINISH <br />GRADE PER C.S.A. STD PLAN <br />1,650.00 <br />41,250.00 <br />1410 <br />4 <br />ADJUST SEWER MANHOLE <br />31 <br />EA <br />S <br />S <br />FRAME AND GRATE TO FINISH <br />GRADE PER C.S.A. STD PLAN <br />1,430.00 <br />48,620.00 <br />1201 <br />5 <br />ADJUST SURVEY MONUMENT <br />3 <br />EA <br />S <br />FRAME AND COVER TO <br />FINISHED GRADE PER C.S.A. <br />2,000.00 <br />6,000.00 <br />STD PLAN It 17 <br />6 <br />SIGNING AND STRIPING <br />1 <br />LS <br />$ <br />500,000.00Jfi507 <br />00.00 <br />P-9 of P-30 <br />