Laserfiche WebLink
TABLE 3 <br />CONVEYANCE AND DISTRIBUTION SYSTEM BENEFITS <br />(Description <br />PUMPING PLANTS - 230 KV & 69 KV DISCONNECTS REPLACEMEN T <br />ESS STRUCTURE, TRANSITION STRUCTURE AND MANHOLE COVER REPLACEM ENT <br />PUMPING PLANTS - BRI DGE CRANES <br />PUMPING PLANTS - TRANSFORMER BANK BRIDGE <br />EN MCCOLLOCH PIPELINE- RIGHT OF WAY <br />EN MCCOLLOCH PIPELINE- UPDATE IMODIFY ALL BOYLE ENGINEERING DRAWINGS <br />EDUCT & PUMPI NG PLANT ISOLATION f ACCESS FIXTURES -STUDY <br />EDUCT & PUMPI NG PLANT ISOLATION GATES <br />DWHEAD EAST TUNNEL CONSTRUCTION <br />DWHEAD TDS REDUCTI ON <br />DWHEAD TUNNELS CLAIMS COST <br />DWHEAD TUNNELS CONNEC TCR ROAD <br />DWHEAD TUNNELS CONSTRUC TION <br />DWHEAD TUNNELS ENGI NEERI NG <br />ARROWHEAD TUNNELS RE-DESI GN <br />ARROWHEAD WEST TUNNEL CONSTRUCTION <br />AULD VALLEY CONTROL STRUCTURE AREA FACI LITIES UPGRADE STUDY <br />AUXILIARY POWER SYSTEM REHABS LITATION 1 UPGRADES STUDY <br />BACHELOR MOUNTAIN COMMUNICATION SITE ACQUISITION <br />BACHELOR MOUNTAIN TELECOM SITE IMPROVEMENTS <br />BANK TRANSFOR MERS REPLACEM ENT STUDY <br />BLACK METAL MOU NTAIN - COMMUNICATIONS FACI LITY UPGRADE <br />BOX SPRINGS FEEDER REHAB PHASE 111 <br />BUDGET ADJUSTMENT <br />CABA70N RADIAL GATE FACILITY IMPROVEMENTS <br />CATHODIC PROTECTION STUDY - DESIGN AND CONSTRUCTION <br />CCRP - BLOW -OFF VALVES PHASE 4 PROJECT <br />CCRP - CONTINGENCY <br />CCRP - EMERGENCY REPAIR <br />CCRP - HEAD GATE OPERATORS & Cl RCUIT BREAKERS REHAB. <br />CCRP - PART 1 & 2 <br />CCRP - SAND TRAP CLEANING EQUIPMENT &TRAVELING CRANE STUDY <br />CCRP - TRANSI TION & MAN -WAY ACCESS COVER REPLACEM ENT - STUDY & DESIGN <br />CCRP - TUNNELS STUDY <br />CEPSRP-230 KV SYSTEM SYNCHRONIZERS <br />CEPSRP-ALL PUMPING PLANTS -CONTI NGENCY & OTHER CREDITS <br />CEPSRP - ALL PUMPING PLANTS - REPLACE 6.9 KV TRANSFO RMER BUSH INGS <br />CEPSRP - ALL PUMPING PLANTS - REPLACE 230KV , 69 KV & 6.9 KV LIGHTENING ARRESTERS <br />CEPSRP - ALL PUMPING PLANTS- REPLACE 230KV TRANSFORMER PROTECTION <br />CEPSRP- SWITCHYARDS & HEAD GATES REHABILITATION <br />CEPSRP-ALL PUMPING PLANTS- IRON MOUNTAIN -230KV BREAKER SWITCH, INST. <br />COLORADO RIVER AQUEDUCT - PUMPI NG <br />CONTROL SYSTEM DRAWING UPGRADE STUDY (PHASE 1) - STUDY <br />COPPER BASIN AND GENE DAM OUTLET WORKS REHABI LITATION (STUDY & DESIGN) <br />COPPER BASIN INTERIM CHLORINATION SYSTEM <br />COPPER BASIN OUTLET GATES RELIABILITY <br />COPPER BASIN POWER & PHONE LI NES REPLACEMENT <br />CORROSION CONTROL OZONE MATERIAL TEST FACILITY <br />COST OF LAND AND RI GHT OF WAY <br />CRA - ACCESS STRUC TURF, TRANSITION STRUCTURE AND MAN HOLE COVER REPLACEM ENT <br />CRA-AQUEDUCT AND PUMPING PLANT ISOLATION GATES <br />18 <br />