My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA (4)
Clerk
>
Contracts / Agreements
>
M
>
METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 4:49:46 PM
Creation date
9/16/2024 10:52:01 AM
Metadata
Fields
Template:
Contracts
Company Name
METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA
Contract #
A-1965-001
Agency
Public Works
Destruction Year
1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
View images
View plain text
TABLE S <br />CONVEYANCE AND DISTRIBUTION SYSTEM BENEFITS <br />(Description <br />CRA CONVEYANCE RELIABILITY PROGRAM PART 1 & PART 2 <br />CRA DESERTAIRFIELDS IMPROVEMENT <br />CRA DISCHARGE CONTAINMENT PROGRAM - CONTINGENCY <br />CRA DISCHARGE CONTAINMENT PROGRAM - GENE & IRON DRAIN SYSTEMS <br />CRA DISCHARGE CONTAINMENT PROGRAM - INVESTIGATION <br />CRA DISCHARGE CONTAINMENT PROGRAM - OIL & CHEMICAL UNLOAD] NG PAD CONTAINMENT <br />CRA ELECTRI CAL 1 POWER SYSTEM RELIABILITY PROGRAM (CEPSRP) <br />CRA ENERGY EFFICIENCY IMPROVEMENTS <br />CRA GENE STORAGE WAREHOUSE REPLACEMENT <br />CRA HINDS PUMPING PLANT - WASH AREA UPGRADE <br />CRA INTAKE PPLANT- POWER & COMMUNICATION LINE REPLACEMENT <br />CRA IRON GARAGE HEAVY EQUIPMENT SERVI CE PIT REPLACEMENT <br />CRA IRON HOUSING REPLACEMENT <br />GRA MAIN PUMP STUDY <br />CRA MILE 12 POWER LINE & FLOW MONITORING EQUIP. STUDY <br />CRA PUM P PLANT FLOW METER UPG RADE <br />CRA PUMP PLANT SUMP PIPING REPLACEMENT STUDY <br />CRA PUMPING PLANT RELIABILITY PROGRAM - HIGH PRESSUR E COMPRESSOR REPLACEM ENT <br />CRA PUMPING PLANT RELIABILITY PROGRAM - SUCTION & DISCHARGE LINES EXPANSION JOINT STUDY <br />CRA PUMPING PLANTS SWITCH HOUSE FAULT CURRENT PROTECTI ON <br />CRA PUMPING PLANTS VULNERABI LITY ASSESSM ENT <br />CRA PUMPING WELL CONVERSION <br />ORA QUAGGA MUSSEL BARRI ERS <br />CRA RELIABILITY PROGRAM - DISCHARGE VALVE L UBRICATORS <br />CRA RELIABILITY PROGRAM - MOTOR BREAKER FAULTY CURR ENT STUDY (5 PLANTS) <br />CRA RELIABILITY PROGRAM PHASE 8 (AQUED LOT PHASE 6 REHAB.) - SPEC 1588 <br />CRA SEISMIC EVALUATION -SWITCH HOUSE AND PUMP ANCH ORAGE <br />CRA SERVI CE CONNECTI ON DWCV-2T VALVES REPLACEMENT AND STRUCTURE CO NSTRUCTION <br />CRA SERVICE CONNECTION DWCV-4 VALVES REPLACEMENT <br />GRA SIPHON REHAB <br />CRA SI PHONS, TRANSITIONS, CANALS, AND TUNN ELS REHABILITATION AND IMPROVEMENTS <br />DAM SLUICEWAYS AND OUTLETS REHABI LITATION <br />DANBY TOWER HOOTER REPLACEMENT <br />DESERT FACI LITIES FIRE PROTECTION SYSTEMS UPGRADE <br />DESERT LAND ACQU ISITIONS <br />DESERT PUM P PLANT 01 L CONTAINMENT <br />DESERT ROADWAY IMPROVEM ENT <br />DESERT SEPTI G SYSTEM <br />DESERT SEWER SYSTEM REHABILITATION <br />DESERT WATER TANK ACCESS- FIR E WATER, CIRCULATING WATER, DOMESTIC WATER- STUDY <br />DIEMER FILTRATION PLANT - METROPOLITAN/SCE HELI PAD LAND SITE <br />DISCHARGE LINE ISOLATION BULKHEAD CO UPLINGS <br />DISTRIBUTION SYSTEM FACILITIES- REHABILITATION PROGRAM <br />DISTRIBUTION SYSTEM FACILITIES REHABILITATION PROGRAM - MAINTENANCE & STORAGE SHO P (PC-1) <br />DISTRIBUTION SYSTEM RELIABILITY PROGRAM - PHASE 2 <br />DVL TO SKINNER TRANSMISSION LINE STUDY <br />E. THORNTO N IBBETSO N GUEST QUARTERS <br />EAGLE AND HI NDS EQUIPMENT WASH AREA UPGRADE <br />EAGLE. KITCHEN UPGRADE <br />SYSTEM <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).