My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF (24)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
ORANGE, COUNTY OF (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2026 8:30:48 AM
Creation date
9/16/2024 3:05:31 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
A-1990-109
Agency
Public Works
Destruction Year
1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I C. Upon approval of the plans, specifications and estimate for <br />PROJECT by DIRECTOR, promptly undertake and perform all the work of issuing a <br />2 change order to include the County's PROJECT in the CITY's construction contract. <br />If the change order cost is more than the County's estimate, CITY shall obtain <br />3 COUNTY's written concurrence for issuance of the change order. DIRECTOR may <br />authorize change order award in such case, subject to the cost limit of Section II <br />4 B herein. If the Director does not approve the award of County PROJECT, the <br />PROJECT will be eliminated from the City's Construction Contract. <br />5 D. During the period of construction, have jurisdiction over the <br />6 construction area including COUNTY PROJECT area. <br />7 E. Obtain the written concurrence of DIRECTOR prior to issuing <br />PROJECT change orders affecting PROJECT design for portions of PROJECT for COUNTY <br />8 Scope of Mork and note any plan changes on record drawings. <br />9 F. Not accept improvements under the change order for PROJECT until <br />DIRECTOR approves, in writing, the construction as it affects the operation and <br />10 maintenance of PROJECT within COUNTY Scope of Work. <br />11 G. Furnish DIRECTOR one set of marked up bluelines for as -built <br />construction drawings for all portions of PROJECT within COUNTY Scope of Work and a <br />12 copy of PROJECT Notice of Completion. <br />13 II. COUNTY shall: <br />14 A. Issue the plans and specifications to the City for portion of <br />PROJECT within COUNTY Scope of Work. <br />15 B. Be responsible for funding 100% share of administration and <br />16 construction costs and testing and inspection costs, not to exceed Ten Thousand <br />Dollars ($10,000) for that portion of PROJECT construction within COUNTY Scope of <br />17 Work. The estimated cost for COUNTY's PROJECT's construction cost is approximately <br />Eighty Thousand Dollars ($80,000) and in no event shall the final construction cost <br />18 to COUNTY exceed Eighty Thousand Dollars ($80,000) without written approval of <br />COUNTY. <br />19 <br />C. At all times during the progress of construction of PROJECT within <br />20 COUNTY Scope of Mork have access to the work thereon for the purpose of inspection <br />and, should COUNTY deem any remedial measures to be necessary, COUNTY shall notify <br />21 CITY thereof. <br />22 III. PAYMENTS AND FINAL ACCOUNTING: <br />23 A. After CITY executes the change order for PROJECT construction, <br />COUNTY will deposit with CITY, COUNTY's share of PROJECT construction cost based on <br />24 estimated costs plus testing and inspection costs to be incurred by the City. <br />25 <br />26 <br />27 <br />EK:sa:lmc <br />28 0429m-2 -2- <br />9-12-90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.