My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - (Item 18) - Construction Contract with Vido Samarzich, Inc.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/23/2024 Adjourned Regular and Special SA
>
Item 13 - (Item 18) - Construction Contract with Vido Samarzich, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 9:12:43 AM
Creation date
9/23/2024 9:11:26 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJITCI'N() 20-69(t5,A'IP5063(196) S'I'ANDAI{DAVI-BIKLWAYI;I{OMWAI{N|RAVtjt-O2NDSt <br />PROJEC l'N(). 20-(t9(t2. A1P 50rr3(198) MCIADDIaN r\VE BIKI:-_W.A.Y FR0M II.A.R|0R Br-vD 'fo (;R.,\NI) A\rr: <br />PROJIICT N0. 2-l-6707 ST'ANDARD AVE PAVIIN{ENT RIrI'IABILIIAI]ON I]ROM WAITNLI{ A\,E lo 2ND ST <br />PRO.IF.Cl NO.23-6705 i\4ClrAI)l)t',NAVl:PAVIIMllNltthFIABILflA'flONI-ROMIIARIIOI{UI-VDTOITAIRVIEWS-f <br />PROJECI'N(). I9-6923 MCI--ADDI]N AVE PA\']']M:]NT RIHABII,II'ATION I]I{OM I:A]I{VII]W ST T0 RAITI' S1' <br />PRO.TLC'I NO, 23-6706 . MCF'ADDL.,N AVE PAVI.,MIN I ITI]IIABILTTAIION IITON,I il.{i f I SI TO CiII.AND AVIJ <br />Item Description Qty llnif I lnit Price Amorrnf <br />38 CONSTRUCT CATCH BASIN <br />TYPE ''B'' PER C.S.A. PLAN STD. <br />PLAN 302. (W=21',) <br />I EA $i <br />23,000.00 <br />$ <br />23,000.00 <br />39 CONSTRLICT CATCH BASlN <br />I'YPE ''C'' PER C.S.A STD PLAN <br />NO 103 (W=4') <br />I EA $; <br />13,000.00 <br />$ <br />13,000.00 <br />40 CATCH BASIN INLET <br />RECONSTRUCTION (TOP SLAB <br />ONLY) <br />I EA $ <br />11,000.00 <br />$ <br />11,000.00 <br />4t CONSTRUCT MANHOLE <br />JUNCTION CHAMBER TYPE "8" <br />PER C.S.A STD PLAN 308 <br />I EA $ <br />19,000.00 <br />$ <br />19,000.00 <br />42 CONSTRUCT MANHOLE <br />.IIJNCTION CHAI\,IBER TYPE "C'' <br />PER C'.S.A, S'I'D PLAN 308 <br />I EN $ <br />19,000.00 <br />$ <br />19,000.00 <br />43 CONSTRUCT 6" CLEAN OUT I EA $ <br />4,000.00 <br />$ <br />4,000.00 <br />44 INSTALL ] 8" RCP (D LOAD PER <br />PLAN) AND BEDDING DETAILS <br />PER C.S.A. STD, PLAN 1 I50 <br />140 LF $, <br />700.00 <br />$; <br />98,000.00 <br />45 TNSTALL 24" RCP (D LOAD PER <br />PLAN) AND tsEDDING DE]AILS <br />PER C,S.A. STD. PLAN I I50 <br />t4 Lu $ <br />900.00 <br />$ <br />12,600.00 <br />46 CONSTRUCT CONCRETE <br />COLLAR (D:24'') FOR RCP PER <br />C.S.A. STD. PLAN 320 <br />I EA Ji <br />3,000.00 <br />$; <br />3,000.00 <br />47 STANDARD AVE. FILTERRA <br />I8'X 8'SYSTEM <br />I EA $ <br />130,000.00 <br />$ <br />130,000.00 <br />48 MCFADDEN AVE - FILTERRA <br />20'X 5' SYSTEM <br />I EA $ <br />120,000.00 <br />$ <br />120,000.00 <br />49 \4CFADDEN AVE - CONCRETE <br />MODULAR WETLANDS BMP <br />SYSTEN{ (MWS-L-4-8- 3' -2" -C- <br />UG) <br />I EA $ <br />90,000.00 <br />$ <br />90,000.00 <br />50 MCFADDEN AVE - CONTECH <br />CONNECTOR PIPE SCR-EEN <br />-l EA $ <br />4,500.00 <br />$ <br />13,500.00 <br />_sI ]\4CFADDEN AVE - CONTECH <br />FULL CAPTURE FILTER WITH <br />TROUGH SYSTEM (BrO-CURB- <br />FULL-24) <br />I EA $ <br />9,000.00 <br />$ <br />9,000.00 <br />52 CONSTRUC'T SIDEWALK <br />UNDERDRAIN <br />2 EA $ <br />10,000.00 <br />$ <br />20,000.00 <br />53 N,IODIFIED PARKWAY <br />CULVERT <br />I EA $ <br />25,000.00 <br />$ <br />25,000.00 <br />P-4 of P-29
The URL can be used to link to this page
Your browser does not support the video tag.