Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.20-G9G5, ATP 5003(196) - STANDARD AVE BIKEWAY FROM WARNER AVE TO 2N9 ST <br />PROJECF NO.20-b9G2, ATP 5003(198) MCFADDEN AVE BIKEWAY FROM HARBOR BLVD TO GRAND AVE <br />PROJECT NO, 23-6707 - STANDARD AVE PAVEMENT REHABIUTAFfON I•ROM WARNER AVE TO 2ND ST <br />PROJECT NU. 23-6705 - MCFADDEN AV1 PAVFM ENi' RhHABILFFATION FROM HARBOR BI.VD TO FAIRVIEW ST <br />PROJEC:-1' NO. 19-6923 - MCFADDEN AVE PAVFMEM]' RLHABILFFATION FROM FAIRVIEW ST TO RAITT ST <br />PROJECT NO.23-6706 - MCFADDEN AVE PAVEMENT REHABILITATION FROM RAITT ST TO GRAND AVE <br />Item <br />Description <br />QtY <br />I.Init <br />Ilnit Price <br />Amount <br />38 <br />CONSTRUCT CATCH BASIN <br />1 <br />EA <br />S <br />TYPE "B" PER C.S.A. PLAN STD. <br />23,000.00 <br />23,000.00 <br />PLAN 302. =21' <br />39 <br />CONSTRUCT CATCH BASIN <br />1 <br />EA <br />'S <br />k <br />TYPE "C" PER C.S.A STD PLAN <br />13,DD0.D0 <br />13,000.00 <br />NO. 303 (W=N) <br />40 <br />CATCH BASIN INLET <br />1 <br />FA <br />5 <br />ti <br />RECONSTRUCTION (TOP SLAB <br />11,000,00 <br />11, 000.00 <br />ONLY) <br />41 <br />CONSTRUCT MANHOLE <br />I <br />EA <br />S <br />JUNCTION CHAMBER TYPE"B" <br />19,000.00 <br />19,000,00 <br />PER C.S.A. STD PLAN 308 <br />42 <br />CONSTRUCT MANHOLE <br />1 <br />EA <br />S <br />$ <br />JUNCTION CHAMBER TYPE "CC" <br />19,000.00 <br />19,000.00 <br />PER C.S.A. STD PLAN 308 <br />43 <br />CONSTRUCT 6" CLEAN OUT <br />I <br />EA <br />S <br />4,000.00 <br />4,000.00 <br />44 <br />INSTALL 18" RCP (D LOAD PER <br />140 <br />LF <br />S <br />$ <br />PLAN) AND BEDDING DETAILS <br />700.00 <br />98,000.00 <br />PER C.S,A, STD. PLAN 1150 <br />45 <br />INSTALL 24" RCP (D LOAD PER <br />14 <br />LF <br />$ <br />S <br />PLAN) AND BEDDING DETAILS <br />900.00 <br />12,600.00 <br />PER C.S.A. STD, PLAN 1150 <br />46 <br />CONSTRUCT CONCRETE <br />l <br />EA <br />S <br />COLLAR (D=24") FOR RCP PER <br />3,000.00 <br />3,000.00 <br />C.S.A. STD. PLAN 320 <br />47 <br />STANDARD AVE - FILTERRA <br />1 <br />EA <br />$ <br />S <br />18' X S' SYSTEM <br />130,000.00 <br />130,000.00 <br />48 <br />MCFADDEN AVE - FILTERRA <br />l <br />EA <br />S <br />20' X 5' SYSTEM <br />120,000.00 <br />120,000.00 <br />49 <br />MCFADDEN AVE - CONCRETE <br />I <br />EA <br />b <br />$ <br />MODULAR WETLANDS BMP <br />SYSTEM (MWS-L-4-8-3'-2"-C- <br />90,000.00 <br />90,000.00 <br />UG) <br />50 <br />MCFADDEN AVE - CONTECH <br />3 <br />EA <br />$ <br />CONNECTOR PIPE SCREEN <br />4,500.00 <br />13,500.00 <br />51 <br />MCFADDEN AVE - CONTECH <br />1 <br />EA <br />S <br />$ <br />FULL CAPTURE FILTER WITH <br />TROUGH SYSTEM (BIO-CURB- <br />9,000.00 <br />9,000.00 <br />FULL-24) <br />52 <br />CONSTRUCT SIDEWALK <br />2 <br />EA <br />S <br />UNDERDRAIN <br />10,000.00 <br />20,000.00 <br />53 <br />MODIFIED PARKWAY <br />1 <br />FA <br />S <br />S <br />CULVERT <br />25,000.00 <br />25,000.00 <br />P-4 of P-29 <br />