Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 20-6965, ATP 5063(196) - STANDARD AVE BIKEWAY FROM WARNER AVE TO 2ND ST <br />PROJECT NO.20-6962, A'rP 5063(198) MCFADDEN AVE BIKEWAY FROM HARBOR 13I..VD TO GRAND AVE <br />PROJECT NO- 23.6707 STANDARD AVE PAVEMENT REHABILITATION FROM WARNER AVE TO 2"O ST <br />PROJECI' NO.23-6705 - MCFAllOFN AVE PAVEME?N I' REHABILITATION FROM HARBOR BLVD TO FAIRVIEW ST <br />PROJECT NO. i9-692:3 -- MCFADDEN AVE PAVEMI-NT REHABILITATION FROM FAIRVIEW ST TO RAITT ST <br />PROJECT NO, 23-0706 - MCFADDEN AVE PAVEMENT REIABILITATION FROM RAITT ST TO GRAND AVE <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />54 <br />ADJUST WATER VALVE <br />138 <br />EA <br />5 <br />S <br />FRAME AND OVER TO FINISH <br />GRADE PER C.S.A. STD PLAN <br />1,500.00 <br />207,000.00 <br />14I0 <br />55 <br />ADJUST GROUNDWATER <br />6 <br />FA <br />S <br />S <br />MONITORING WELL COVER <br />1,500.00 <br />9,000,00 <br />TO FINISH GRADE <br />56 <br />ADJUST SEWER CLEANOUT <br />1 <br />EA <br />5 <br />S <br />FRAME AND COVER TO <br />FINISHED GRADE PER C.S.A. <br />1,500.00 <br />1,500-00 <br />STD PLAN 1204 <br />57 <br />ADJUST SEWER MANHOLE <br />66 <br />EA <br />S <br />S <br />FRAME AND GRATE TO FINISH <br />GRADE PER C.S.A. STD PLAN <br />1,500-OD <br />99,000.00 <br />1201 <br />58 <br />ADJUSTSTORM DRAIN <br />13 <br />EA <br />S <br />ti <br />MANHOLE FRAME AND <br />GRATE TO FINISH GRADE PER <br />1,500.00 <br />19,500-00 <br />C.S.A. STD PLAN 120t <br />59 <br />RELOCATE FIRE HYDRANT <br />3 <br />EA <br />S <br />AND ASSEMBLY <br />18,000.00 <br />54,000,00 <br />60 <br />REMOVE FIRE HYDRANT AND <br />2 <br />EA <br />$ <br />ASSEMBLY TO 3-FT BELOW <br />4,000,00 <br />8,000.00 <br />GRADE <br />61 <br />ADJUST WATER METER TO <br />:3 <br />EA <br />$ <br />FINISHED GRADE PER C,S.A. <br />700.00 <br />2,100-00 <br />STD PLAN 1401 <br />62 <br />ADJUST TRAFFIC PULLBOX TO <br />8 <br />EA <br />$ <br />S <br />FINISHED GRADE <br />750.00 <br />6,000.00 <br />63 <br />FURNISH AND INSTALL NEW <br />16 <br />EA <br />$ <br />WATER VALVE FRAME AND <br />COVER TO FINISHED GRADE <br />1,700.00 <br />27,200-00 <br />64 <br />REMOVE EXISTING CHAIN <br />140 <br />LF <br />N, <br />LINK FENCE <br />40-00 <br />5,600.00 <br />65 <br />INSTALL 6' CHAIN LINK <br />140 <br />LF <br />5 <br />S <br />FENCE PER SPPWC STD, PLAN <br />95.00 <br />600-4 <br />13,300,00 <br />66 <br />REMOVE AND INSTALL <br />1 <br />EA <br />S <br />S <br />STREET LIGHT WITH CONDUIT <br />AND PULLBOX PER C.S.A. STD <br />12,000-00 <br />12,000.00 <br />PLAN 1 126H <br />67 <br />REMOVE- CONFLICT UTILITY <br />11 <br />EA <br />$ <br />S <br />SERVICE LINE <br />2,000-00 <br />22,000-00 <br />68 <br />INSTALL 1" COPPER WATER <br />4 <br />EA <br />S <br />S <br />SERVICE WITH 1" METER PER <br />C.S.A. STD. PLAN 1401. <br />10.000-00 <br />40,000-00 <br />LOCATION PER LANDSCAPE <br />PLAN <br />P-5 of P-29 <br />