My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGA ENGINEERS, INC
Clerk
>
Contracts / Agreements
>
A
>
AGA ENGINEERS, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 12:17:01 PM
Creation date
9/24/2024 12:16:09 PM
Metadata
Fields
Template:
Contracts
Company Name
AGA ENGINEERS, INC
Contract #
N-2024-318
Agency
Public Works
Expiration Date
8/27/2025
Insurance Exp Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N"Engineers, <br />July 30, 2024 <br />EXH I BIT A <br />Mr. Zdenek "Zed" Kekula <br />Principal Civil Engineer <br />Public Works Agency —Traffic Engineering <br />City of Santa Ana <br />20 Civic Center Plaza <br />Santa Ana, California 92701 <br />RE: Proposal for Additional Services for the 2023 Citywide Engineering and Traffic Survey <br />Dear Mr. Kekula <br />AGA Engineers, Inc. (AGA) is pleased to present to you this Letter Proposal in response to your email <br />dated August 10, 2023, to provide additional services to augment the 2023 Citywide Engineering <br />and Traffic Survey (E&TS). <br />The AGA Team will be headed by Mr. Ruben Perales, Vice President, who will serve as Project <br />Manager and Engineer of Record and will be the City's main contact for the project. Mr. Perales has <br />conducted EUS projects for the Cities of Seal Beach, Gardena, Burbank, Garden Grove, Laguna <br />Niguel, Redondo Beach, Huntington Beach, and Santa Ana. <br />Our proposed scope of services will involve the following: <br />♦ Conduct a Kick-off Meeting with City staff prior to beginning the project. <br />♦ Conduct a minimum of 100 radar speed observations, with a minimum of 50 observations <br />for each direction of travel, under free flow traffic conditions at six (6) roadway segments <br />along Santa Ana Boulevard between Raitt Street and Grand Avenue. Construction is <br />currently ongoing along Santa Ana Boulevard for the OC Streetcar. The City will advise when <br />construction activities are completed and traffic has adjusted. <br />♦ Review all the Santa Ana Boulevard roadway segments for unique roadway characteristics <br />not readily apparent to motorists which would justify decreasing the 851" percentile speed <br />survey data to the maximum reduction permitted under the State established guidelines. <br />This review will be conducted by a registered Traffic Engineer in the State of California. <br />♦ Identify midblock roadway accidents for the Santa Ana Boulevard survey segments. <br />Midblock roadway accidents are defined as accidents occurring outside of a 150' radius of a <br />signalized intersections within the survey segments. <br />♦ Calculate the respective accident rates based on the 24-hour bi-directional traffic counts and <br />compare them to the published State average expected accident rates. The State of <br />AGA Engineers, Inc, <br />211 Imperial Highway, Suite 208, Fullerton, CA 92835 <br />(714) 992-4592 Email: aga@agaengineersinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.