Laserfiche WebLink
<br /> <br /> <br /> Proposal # P-9586 <br />The human connection between you and your technology. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Power Supplies <br />Blueviolet/Lanmor Services will be utilizing new power supplies at each of the controller locations. Which will include new <br />batteries for battery backup. All connections to the power supplies will already be completed and tested prior to the start <br />of programming the AMAG controllers. <br /> <br />If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a <br />change order to handle the additional work. This will be handled with a change order at time and materials billing. <br /> <br />Readers <br />Blueviolet/Lanmor Services will be programming new readers in the City’s AMAG Symmetry system. Lanmor service will <br />follow the naming schemes currently in place with the City of Santa Ana at the City Hall locations. <br /> <br />All connections to the card readers will already be completed and tested prior to the start of programming the AMAG <br />controllers. <br /> <br />If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a <br />change order to handle the additional work. This will be handled with a change order at time and materials billing. <br />. <br />Cabling <br />Blueviolet/Lanmor Services will be utilizing cabling provided and installed by others. The contractor is responsible for <br />providing wire details and wire run locations to Lanmor prior to the beginning of programming. All wires will need to <br />properly be labelled at each controller. <br /> <br />If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a <br />change order to handle the additional work. This will be handled with a change order at time and materials billing. <br />Training <br />Blueviolet/Lanmor Services will not be providing any training with this project. Blueviolet/Lanmor Services will provide all <br />programming sheets with door names for the City to handle the AMAG Symmetry programming door schedules and <br />assigning groups. The City will be responsible for adding the library employees into the system as well. <br />Networking Requirements <br />Blueviolet/Lanmor Services will require the City of Santa Ana IT’s department to provide data connections for each of the <br />new door controller locations. These have been labeled on the attached maps. Blueviolet/Lanmor Services will utilize the <br />existing cable runs to the security switches. <br />The IT department is responsible for providing the IP address mapping for each door controller. It is Lanmor Service’s <br />responsibility to provide the IT department with the MAC addresses for each new controller prior to the beginning of the <br />installation. Blueviolet/Lanmor Services will configure the door controllers, which will allow the IT department to map the <br />correct IP address to each device. The City’s IT department will have the final approval on all IDF room connections. It is <br />the responsibility of the customer to confirm IDF connections via the attached drawings. Any changes to the IDF locations <br />after the acceptance of the project may require a change order for addition labor to increase the wire runs. <br /> <br />Blueviolet/Lanmor Services has been provided with the contact information for Mike Fetner (mfetner@santa-ana.org) and <br />Greg Dunham (gdunham@santa-ana.org) as points of contacts with all IT related questions.