My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Agreement with BlueViolet for Security, Access Control, and Intercom Maintenance
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 20 - Agreement with BlueViolet for Security, Access Control, and Intercom Maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 11:51:38 AM
Creation date
9/25/2024 8:18:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20
Date
10/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Proposal # P-9587 <br />The human connection between you and your technology. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project Details <br />Job Details <br />AMAG Software <br />Blueviolet/Lanmor Services will utilizing the existing instance of the AMAG Symmetry software on the client supplied and <br />configured virtual server. Blueviolet/Lanmor Services will require remote access to this system during the installation <br />phase of the project. Blueviolet/Lanmor Services would request ongoing remote access to best handle support issues <br />after the initial project installation. This can be managed by the City’s IT department. <br /> <br />Blueviolet/Lanmor Services will install One AMAG client on a City provided computer at the Library facility. The AMAG <br />software client will be supplied by others. <br /> <br />Site Locations <br />The following locations are being converted to the new AMAG access control system: <br /> <br />- City of Santa Ana Library <br /> <br />See the attached project door schedule for details on each reader location . It is the responsibility of the contract and <br />electrical sub contractor to provide details of the AMAG door controllers, card reader, duress buttons and door release <br />devices. If this is not provided, Lanmor Service will provide a change order for additional time to identify these areas and <br />confirm locations based on construction drawings and be billed as time and materials. <br /> <br />Door Controllers <br />Blueviolet/Lanmor Services will be programming the new AMAG Door controllers. Lanmor service will follow the naming <br />schemes currently in place with the City of Santa Ana at the City Hall locations. <br /> <br />Power Supplies <br />Blueviolet/Lanmor Services will be utilizing new power supplies at each of the controller locations. Which will include new <br />batteries for battery backup. All connections to the power supplies will already be completed and tested prior to the start <br />of programming the AMAG controllers. <br /> <br />If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a <br />change order to handle the additional work. This will be handled with a change order at time and materials billing. <br /> <br />Readers <br />Blueviolet/Lanmor Services will be programming new readers in the City’s AMAG Symmetry system. Lanmor service will <br />follow the naming schemes currently in place with the City of Santa Ana at the City Hall locations. <br /> <br />All connections to the card readers will already be completed and tested prior to the start of programming the AMAG <br />controllers. <br /> <br />If it is determined the above work has not been completed or non-operations. Blueviolet/Lanmor Services will provide a <br />change order to handle the additional work. This will be handled with a change order at time and materials billing. <br />. <br />Cabling <br />Blueviolet/Lanmor Services will be utilizing cabling provided and installed by others. The contractor is responsible for <br />providing wire details and wire run locations to Lanmor prior to the beginning of programming. All wires will need to <br />properly be labelled at each controller.
The URL can be used to link to this page
Your browser does not support the video tag.