My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Construction Contract with Elecnor Belco Electric, Inc. for the Traffic Signal
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 22 - Construction Contract with Elecnor Belco Electric, Inc. for the Traffic Signal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 11:51:10 AM
Creation date
9/25/2024 8:19:23 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
10/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Traffic Signal Installation at Segerstrom Avenue and Spruce Street <br />October 1, 2024 <br />Page 4 <br />As indicated in the Cost Analysis (Exhibit 4) and as summarized in the table below, the <br />estimated total construction delivery cost of the project is $803,348. <br />Project Item <br />Total <br />Construction Contract Bid Amount <br />$642,628 <br />Construction Administration <br />$51,088 <br />Inspection <br />$31,810 <br />Testing <br />$13,497 <br />Project Contingencies <br />$64,325 <br />TOTAL ESTIMATED CONSTRUCTION DELIVERY COST <br />$803,348 <br />ENVIRONMENTAL IMPACT <br />Pursuant to the California Environmental Quality Act (CEQA), the recommended actions <br />are exempt from further review pursuant to Section 15301(b) of the CEQA Guidelines <br />for projects consisting of repair/maintenance of existing public facilities. The proposed <br />project continues to meet these parameters of the CEQA Guidelines, and Categorical <br />Exemption Environmental Review No. ER-2024-64 was filed for Project 24-6045 <br />(Exhibit 5). <br />FISCAL IMPACT <br />As indicated in the Cost Analysis, the estimated total construction delivery cost of the <br />project is $803,348. All funds are available for expenditure in Fiscal Year 2024-25. Any <br />remaining balances not expended at the end of the fiscal year will be carried forward <br />into Fiscal Year 2025-26. <br />The proposed contract authorizes staff a maximum of 10% in contingencies for <br />construction contract change orders. Staff will return to the City Council for authorization <br />and appropriation of additional contingency if necessary. <br />With the approval of the requested appropriation adjustment, a portion of the <br />accumulated fund balance will be appropriated for spending in the New Transportation <br />System Improvements Area E, Improvements Other Than Buildings Account (No. <br />03417660-66220). The spendable portion of the fund balance is estimated to be <br />$1,331,631 as of June 30, 2025, which is sufficient to allow for the recommended <br />appropriation of $132,134. The funds will be budgeted and available for this item in the <br />accounts below (Exhibit 6). <br />The following table summarizes the funds budgeted for expenditure to deliver <br />construction of this project: <br />
The URL can be used to link to this page
Your browser does not support the video tag.