My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - Public Hearing Regarding Bristol Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 26 - Public Hearing Regarding Bristol Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 12:33:51 PM
Creation date
9/25/2024 8:40:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
26
Date
10/1/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Related Bristol Specific Plan Entitlements & Development Agreement (3600 S. Bristol St.) <br />and Staff Resolution Modifying Parking Districts in the Surrounding Area <br />October 1, 2024 <br />Page 22 <br />Topic <br />Hotel Economic <br />Benefits <br />Open Space <br />Ad Hoc Committee <br />Recommendation <br />Ensure in the DA that the hotel is <br />operated by an internationally <br />recognized flag or boutique operator, <br />with proven performance records, at a <br />minimum four -star (out of 5) rating. <br />Accept the construction of 13.1 acres <br />of contiguous onsite open space to <br />satisfy the City's park provision and <br />fee requirements. The developer must <br />enter into a public access easement <br />for the open space, and must be <br />recorded on the property, that <br />endures for the life of the project or <br />residential uses on the property. <br />Proposed by DA <br />and (3) $8,000,000 prior to the <br />issuance of the first building permit in <br />furtherance of any component of the <br />Project's third Specific Plan Phase <br />except for building permits in <br />furtherance of the Project Open <br />Space. <br />Consistent — The hotel(s) shall be <br />operated under a recognized hotel <br />flag or by a boutique hotel operator <br />with a demonstrated track record of <br />success operating similar hotels. The <br />developer will secure a four -star hotel <br />or above. <br />The Project's open space will be <br />constructed in a timely manner in <br />accordance with the project's <br />phasing, with "springing" easements <br />recorded commensurate with phases <br />to ensure public access. <br />The Supplemental EIR prepared for <br />the project identifies that the project <br />will result in a demand for 27.7 acres <br />of open space, which is 14.6 acres <br />more than the 13.1 acres provided on <br />site. However, the project will remain <br />consistent with the General Plan <br />pursuant to Table OS-3 (Open Space <br />Element Implementation) of the <br />General Plan, Action Nos. 1.7 and <br />1.10. Action No. 1.7, which <br />recognizes the challenges and <br />difficulty in creating new open space <br />and parklands in a built -out <br />environment and provides for a <br />reduction in on -site open space by <br />giving credits for park land for public <br />use as an incentive toward developer <br />creation of open space areas that are <br />accessible to the public. Action No. <br />1.10 encourages collaboration with <br />property owners to provide public <br />access and programming on private <br />open space. <br />
The URL can be used to link to this page
Your browser does not support the video tag.