My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Furniture for Main Library Renovation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 14 - Furniture for Main Library Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 5:36:10 PM
Creation date
10/3/2024 9:46:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Library
Item #
14
Date
10/1/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a S OL a "at <br />A Oka an <br />IN <br />IM■■ man <br />r. .Pft ,. . <br />Design Support <br />Today's work environments pose various dynamic challenges that leaders are expected to <br />address. We are committed to be a knowledgeable source, armed with the most <br />innovative, healthy and visually interesting solutions possible. We pass this knowledge on <br />to our clients in order to elevate your workplace with an environment that is highly <br />functional, visually exciting and is a cutting -edge solution for your business needs. <br />In order to deliver an environment that meets the specific needs of our clients, we have <br />identified a pragmatic design progression, outlined below, that ensures all facets of a <br />successful project are identified and carried out the GSM way. <br />Discovery <br />This phase maybe defined through consultation, in which case a WE team member, and <br />the Account Executive will meet with the client to discuss and identify the vision, mission, <br />goals and criteria for the project as it pertains to each department within the facility. <br />During the discovery sessions we will identify the work styles, collaborative needs, tools <br />associated with each role and understand the activities workers engage in throughout the <br />day in order to move work forward. Through our understanding of the space needs, work <br />styles, and ratio of collaborative to individual work we can develop designs for supportive <br />work settings. The GSM Electronic Customer Questionnaire's may also be developed, <br />administered and dispersed to different departments and their staff to amass and <br />evaluate space requirements for workstation typical development if so desired by the <br />client. This phase will also include site documentation: field measurement and <br />identification of all existing conditions such as electrical outlets, light switches, <br />thermostats, sill heights, ceiling heights etc. <br />Design Development <br />The information gathered during discovery will be applied to develop circulation diagrams, <br />setting diagrams, furniture space plans color scheme concepts, and material options to <br />be presented and reviewed by the client. Revisions to the design will be made based on <br />client feedback until all elements are approved and designed through scale drawings, <br />material samples, renderings, and mock-ups as required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.