My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Furniture for Main Library Renovation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 14 - Furniture for Main Library Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 5:36:10 PM
Creation date
10/3/2024 9:46:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Library
Item #
14
Date
10/1/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A94 ro 101 <br />GSM Design Approach Cont. <br />Interior Design and Furniture Standards <br />• <br />i <br />Upon completion of design development, drawings will include panel heights, widths, <br />electrical base in -feed locations, outlets, work surfaces, components, finish locations <br />■^ i e <br />^, j <br />j <br />(fabrics, paints, and carpets), 3D drawings and 3D renderings from multiple views <br />illustrating all work settings with the approved color scheme applied. An accurate Bill of <br />t.1 j <br />t <br />Materials of all furnitureldesign components will be derived directly from the final <br />.. <br />•' <br />i <br />drawings and finish selections to develop cost estimates. <br />! <br />f <br />Beyond the bill of materials, product masters will be developed to illustrate the furniture <br />standards (manufacturer, model number, fabric and finish, department, and location within <br />the facility) for the project and will be used by all parties in conjunction with final drawings, <br />color boards, renderings, and all required environmental compliance documentation to <br />p <br />' <br />exhibit the design intent. The documents will serve as reference for all future furniture <br />order "add on" or reconfigures. Product Master's will be printed for client sign off. All <br />' <br />project information will be provided in printed and electronic format. <br />Reconfigures and Future Furniture Orders <br />Auto CAD drawing files and inventory of existing furniture will be updated as each <br />reconfigureladd on occurs. All future furniture orders will be specified according to the billy <br />r <br />i <br />of materials developed in the previous phase to maintain standards for future growth and <br />flexibility. <br />Practices, Codes, and Methods <br />Furniture space plans will be designed to at least meet minimum clearances, exiting <br />requirements, occupancy loads, and seismic provisions. Drawings will be reviewed <br />carefully by the GIM Workplace Excellence Manager and Quality Control Leader to <br />ensure, design and specification accuracy as well as compliance with all codes and <br />regulations that apply.w����� <br />
The URL can be used to link to this page
Your browser does not support the video tag.