My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Related Bristol Specific Plan Ordinances Second Readings (3600 S Bristol Street)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/15/2024
>
Item 25 - Related Bristol Specific Plan Ordinances Second Readings (3600 S Bristol Street)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 6:00:46 PM
Creation date
10/8/2024 4:56:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25
Date
10/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Related Bristol Specific Plan Ordinances Second Readings (3600 S Bristol Street) <br />October 15, 2024 <br />Page 4 <br />The requested entitlements and DA were unanimously approved on October 1, 2024 (6- <br />0-0-1) with Mayor Pro Tern Phan abstaining. As the requested entitlements include two <br />ordinances, they require second readings pursuant to Section 413 of Division 2 of <br />Article IV (City Council) of the City's Charter. <br />ENVIRONMENTAL IMPACT <br />General Plan Update (GPU) Final Program Environmental Impact Report (Final PEIR) <br />In April 2022, the City certified the GPU Final PEIR (SCH No. 2020029087) and <br />adopted the GPU. The GPU Final PEIR is a Program Environmental Impact Report <br />(PEIR) that examines the existing environment and the total scope of environmental <br />effects that would occur as a result of buildout of the GPU land uses. As a Program EIR, <br />the document comprehensively evaluated the potential environmental impacts <br />stemming from adoption of the General Plan Update and subsequent implementing <br />projects. Moreover, this type of EIR allows subsequent implementing activities, such as <br />the proposed Specific Plan, to be evaluated through "tiering." Tiering refers to the <br />coverage of general matters in broader EIRs, such as the GPU Final PEIR, with <br />subsequent narrower EIRs or ultimately site -specific EIRs incorporating by reference <br />the general discussions and concentrating solely on the issues specific to the EIR <br />subsequently prepared, such as in the case of the Related Bristol Specific Plan's <br />Supplemental EIR, which has been prepared for the Project. Tiering is appropriate when <br />the sequence of EIRs is (1) from a general plan, policy, or program EIR to a program, <br />plan, or policy EIR of lesser scope or to a site -specific EIR, (2) from an EIR on a specific <br />action at an early stage to a subsequent EIR or a supplement to an EIR at a later stage. <br />The Project site is located within the South Bristol Street Focus Area and has a land use <br />designation of District Center -High (DC-5), which has a maximum Floor Area Ratio <br />(FAR) of 5.0, or 125 dwelling units per acre (du/ac) and a maximum height of 25 stories <br />that allows up to 8,958,114 SF of mixed uses, inclusive of residential uses, within the <br />Project site. This level of redevelopment was included in the GPU Final PEIR buildout, <br />and applicable mitigation measures were identified, as necessary, to reduce impacts. <br />A project is consistent with the GPU if the development density does not exceed what <br />was contemplated and analyzed for the parcel(s) in the certified GPU EIR and complies <br />with the associated standards applicable to that development density (State CEQA <br />Guidelines Section 15183(i)(2)/Public Resources Code Section 21000 et seq.). <br />Development density standards can include the number of dwelling units per acre, the <br />number of people in a given area, FAR, and other measures of building intensity, <br />building height, size limitations, and use restrictions. <br />Supplemental Environmental Impact Report (SEIR) <br />In compliance with the California Environmental Quality Act (CEQA), and as required by <br />Public Resources Code (PRC) section 21166 and CEQA Guidelines section 15162, the <br />
The URL can be used to link to this page
Your browser does not support the video tag.