My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - 10th Street and Flower Street Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/15/2024
>
Item 12 - 10th Street and Flower Street Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 5:41:04 PM
Creation date
10/8/2024 5:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
12
Date
10/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Initial Studv and Mitiaated Neaative Declaration <br />4.0 CLARIFICATIONS TO THE DRAFT INITIAL STUDY/MITIGATED <br />NEGATIVE DECLARATION <br />4.1 Introduction <br />As a result of comments received on the proposed Project, clarifications have been made to the Draft <br />IS/MND text, which include: <br />1. Minor changes to Project Timing. <br />2. Minor changes to Section 4.18 Tribal Cultural Resources. <br />According to Section 15073.5 of the CEQA Guidelines, "a substantial revision shall mean: <br />(1) A new, avoidable significant effect is identified, and mitigation measures or project revisions <br />must be added in order to reduce the effect to insignificance, or <br />(2) The lead agency determines that the proposed mitigation measures or project revisions will <br />not reduce potential effects to less than significance and new measures or revisions must be <br />required." <br />The clarifications are provided below along with substantiation as to why the change does not constitute <br />a "substantial revision" pursuantto Section 15073.5. Changes in text are identified by st��t where text <br />is removed and by underline where text is added. <br />4.2 Clarifications <br />4.2.1 Project Timing <br />Addition of language to clarify the Project construction timeline. This clarification does not constitute a <br />substantial revision because the clarifications do not identify a new avoidable significant effect or require <br />a new mitigation measure. <br />4.2.1.1 Page 2-6 of the Draft IS/MND: <br />The Project would be constructed in two phases. Project construction is anticipated to begin in Fall U <br />Spring 2025 and occur through Fall 2XS Spring 2026. Phase 1 would include closure of 101" Street and <br />construction of the cul-de-sac, crosswalk, and site preparation forthe northern picnic area. Phase 2 would <br />demolish the existing single-family residences and construct the remaining park amenities including the <br />basketball court, skate park, playground, fitness area, picnic areas, turf, and bioswales. This phase also <br />includes construction of the underground bio-retention facilities. <br />4.2.2 Tribal Cultural Resources <br />Addition of language to Section 4.18 Tribal Cultural Resources. This change was made to clarify the scope <br />of tribal consultation under AB 52 and SIB 18. This clarification does not constitute a substantial revision <br />Clarifications to the Draft IS/MND 4-1 October 2024 <br />10th and Flower Street Park Project 2023-145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.