My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - 10th Street and Flower Street Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/15/2024
>
Item 12 - 10th Street and Flower Street Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 5:41:04 PM
Creation date
10/8/2024 5:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
12
Date
10/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Initial Studv and Mitiaated Neaative Declaration <br />because the clarifications do not identify a new avoidable significant effect or require a new mitigation <br />measure. <br />4.2.2.7 Page 4-84 of the Draft IS/MND: <br />The Gabrieleno Band of Mission Indians— Kizh Nation (Tribe) requested consultation in an email dated <br />July 3, 2024. The City contacted the tribal office by email on July 8, 2024, and suggested several possible <br />times to meet. The Tribe offered to perform consultation via email, to which the City agreed. The Tribe <br />provided historical tribal information to the City via email on July 31, 2024. The Tribe stated that there was <br />a potential to encountertribal cultural resources (TCRs) such as artifacts during construction because of <br />the Project's location in the Santa Ana TCR landscape. The Tribe provided three mitigation measures <br />including tribal monitoring, treatment of non-ceremonial/non funerary objects, and treatment of human <br />remains and associated funerary or ceremonial objects. The City revised the mitigation and provided the <br />edits to the Tribe on August 15, 2024. The City concluded cens ilt-a+inn nn 4i g st 21 2024 <br />On September 5, 2024, the Kizh Nation provided a letter to the City via email. In this letter, the Kizh <br />Nation stated theydo not believe a good faith effort was completed forthe Project, with specific concerns <br />regarding "appropriate tribal representation, particularly concerning tribes with ancestral connections to <br />the project location." On September 26, 2024 the City replied with an email stating that the City has been <br />consulting with three culturally affiliated tribes on this Project using the process dictated by state laws AB <br />52 and SIB 18 since May 2, 2024. During this process, information from the other consulting tribes, <br />including presence of a TCR, had been provided to the City. Based on consultation, the City has <br />determined that tribal monitoring is necessary; however, the City cannot exclude the tribes who have <br />provided information on TCRs and participated in consultation from monitoring. Therefore, the City did <br />not accept the suggested edits to the mitigation measure language. The City concluded consultation on <br />September 26, 2024. <br />The Gabrielino Tongva Indians of California responded via email on May 29, 2024 and requested a copy of <br />the cultural resources report. The report was provided on July 22, 2024. On August 7, 2024, the Tribe <br />requested a monitor during all ground disturbing activities. The City provided a proposed set of <br />mitigation measures to the Tribe on August 15, 2024. The Tribe responded on August 16, 2024 with a <br />request for a rotating staffing schedule to be implemented during construction monitoring, which the City <br />included as an option in the proposed mitigation measures. The City concluded consultation on August <br />24 September 4, 2024. <br />On June 26, 2024, the Juaneno Band of Mission Indians Acjachemen Nation - Belardes responded via <br />email requesting consultation and a copy of the cultural resources report. The Tribe's preliminary <br />recommendation was for all ground disturbance to be monitored by a representative of the Tribe. The <br />City provided the cultural resources report on August 2, 2024. The City provided a proposed set of <br />mitigation measures to the Tribe on August 15, 2024. The City concluded consultation on Auger 21 <br />September 4, 2024. <br />Clarifications to the Draft IS/MND 4-2 October 2024 <br />10th and Flower Street Park Project 2023-145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.