Laserfiche WebLink
Final Initial Studv and Mitiaated Neaative Declaration <br />Table 5-1. 10th and Flower Street Park Project Mitigation Monitoring and Reporting Plan <br />Monitoring <br />Implementation <br />Responsibility for <br />Outside <br />Mitigation Measure <br />Activity/Timing/ <br />Responsibility/ <br />Oversight of <br />Compliance/Coordination <br />Agency <br />Comments <br />Frequency <br />Verification <br />Verification <br />Biological Resources Mitigation Measures <br />Activity: <br />Qualified Biologist <br />Cityof Santa Ana <br />CDFW <br />BIO-1: Pre -Construction Nesting Bird <br />Survey. If ground disturbing Project <br />Pre -construction <br />nesting bird <br />activities, tree trimming, or tree <br />removal are scheduled to occur <br />survey. <br />during the nesting bird season <br />Timing: <br />Initials <br />(February 1 — August 30), a qualified <br />Initials <br />Within three days <br />biologist shall conduct a pre - <br />prior to the start <br />construction nesting bird survey to <br />of construction. <br />ensure that active bird nests will not <br />be disturbed or destroyed. The survey <br />Frequency: <br />shall be completed no more than 3 <br />Date <br />working days prior to initial ground <br />One time. <br />Date <br />disturbance. The nesting bird survey <br />shall include the Project Site and <br />adjacent areas where project activities <br />have the potential to affect active <br />nests, either directly or indirectly due <br />to construction activity, noise, or <br />vibrations. If an active nest is <br />identified, a qualified biologist shall <br />establish an appropriate disturbance <br />limit buffer around the nest using <br />flagging or staking. Construction <br />Mitigation Monitoring and Reporting Plan 5-3 October 2024 <br />10th and Flower Street Park Project 2023-145 <br />