Laserfiche WebLink
Final Initial Studv and Mitiaated Neaative Declaration <br />Table 5-1. 10th and Flower Street Park Project Mitigation Monitoring and Reporting Plan <br />Monitoring <br />Implementation <br />Responsibility for <br />Outside <br />Mitigation Measure <br />Activity/Timing/ <br />Responsibility/ <br />Oversight of <br />Compliance/Coordination <br />Agency <br />Comments <br />Frequency <br />Verification <br />Verification <br />activities shall not occur within any <br />disturbance limit buffer zones until <br />the nest is deemed inactive by the <br />qualified biologist. <br />Cultural Resources Mitigation Measures <br />Activity: <br />Qualified <br />Cityof Santa Ana <br />None. <br />CUL-1: Contractor Awareness Training <br />Contractor <br />Archaeologist <br />Program. The City of Santa Ana shall <br />Awareness <br />ensure that a Contractor Awareness <br />Training Program. <br />Training Program about cultural <br />resources is delivered to train <br />Timing: <br />equipment operators. The program <br />Initials <br />Initials <br />shall be designed to inform <br />Prior to <br />construction personnel about: federal <br />construction. <br />and state regulations pertaining to <br />Frequency: <br />cultural resources and tribal cultural <br />As necessary <br />resources; the subsurface indicators <br />during <br />of resourcesthat shall require a work <br />Date <br />Date <br />stoppage; procedures for notifying <br />construction. <br />the City of any occurrences; project - <br />specific requirements and mitigation <br />measures; and enforcement of <br />Mitigation Monitoring and Reporting Plan 5-4 October 2024 <br />10th and Flower Street Park Project 2023-145 <br />